Croatia · asset class

Power Plants in Croatia

Croatia has 22 power plants mapped on the OverWatts open energy atlas — the 88th-largest fleet of the 155 countries that hold any, and under 0.1% of the world's mapped total. Of these, 12 operating and 9 under construction or proposed. Operating generation capacity totals 3.0 GW across 12 utility-scale plants of 100 MW and above. The largest is Zakučac hydroelectric plant (538 MW).

The largest owner-operators are HEP Generation Ltd (5), Hrvatska elektroprivreda dd (4) and HEP-Proizvodnja doo (3) — HEP Generation Ltd alone is named on 23% of them. Half of Croatia's power plants in service predate 1984 (median commissioning year of the 12 with a known date), 4 came online in the past decade and the oldest still listed is Zakučac hydroelectric plant, dating from 1961. 9 are in the pipeline, led by Blaca Pumped Storage hydroelectric plant (498 MW), proposed. They account for 38% of every energy asset OverWatts maps in Croatia.

22
Power Plant in Croatia
#88
of 155 countries
3.0 GW
Operating capacity
9
In construction / proposed

Operating generation capacity by fuel

On the interactive map

Open the interactive map →

Largest power plants in Croatia

Who owns Croatia's power plants

Counts an asset once per company named as its owner or operator; a joint venture counts for each partner.

When they were built

Median commissioning year 1984 · oldest Zakučac hydroelectric plant (1961) · newest Zadar 2P & 3P wind farm (2024) · 12 of 22 carry a start date

Under construction & proposed

How Croatia compares · power plants by country

Frequently asked

How many power plants are there in Croatia?
OverWatts maps 22 power plants in Croatia — under 0.1% of the world's mapped total, the 88th-largest national fleet of the 155 countries with any.
What is the largest power plant in Croatia?
Zakučac hydroelectric plant, at 538 MW.
How much power-generation capacity do Croatia's power plants have?
About 3.0 GW operating across 12 plants, with a further 2.5 GW under construction or proposed. That covers utility-scale sites of 100 MW and above, so it sits below national installed capacity wherever distributed generation is large.
Who owns the power plants in Croatia?
HEP Generation Ltd is named as owner or operator on the most — 5 of 22 (23%). Next are Hrvatska elektroprivreda dd (4), HEP-Proizvodnja doo (3) and DTEK Group BV (2).
How old are Croatia's power plants?
The median commissioning year is 1984, across the 12 in service with a known start date. The oldest still listed is Zakučac hydroelectric plant (1961); 4 came online in the past ten years.
What new power plants are being built in Croatia?
9 projects are under construction or proposed. The largest are Blaca Pumped Storage hydroelectric plant (498 MW), Lički Medvjed wind farm (425 MW) and Senj II hydroelectric plant (412 MW).

Other asset classes in Croatia

Power Plants in other countries