Croatia — Energy Infrastructure

OverWatts maps 58 energy assets in Croatia across 7 layers — the 81st-largest mapped base of 157 countries. They include 22 power plants, 16 pipelines and 6 LNG terminals. Operating generation capacity is 3.0 GW, led by hydro at 40%.

The companies named on the most assets are Plinacro Ltd (18), HEP Generation Ltd (7) and Hrvatska elektroprivreda dd (5), counting both ownership and operatorship. Half of Croatia's mapped assets in service predate 1984 (median commissioning year of the 26 with a known date), 11 came online in the past decade and the oldest still listed is Sv Kajo Cement Plant, dating from 1904. 15 projects are under construction or proposed, led by Croatia – Serbia interconnection (planned) (600 MW).

58
Total assets
#81
of 157 countries
3.0 GW
operating · 22 power plants
17
LNG Mtpa
15
In construction / proposed

Operating generation capacity by fuel

Utility-scale sites of 100 MW and above. Distributed generation — rooftop solar especially — is outside the tracker, so this runs below national installed capacity.

Electricity generated by fuel · 2025

What the fleet actually produced — distinct from the installed capacity above.

Total 14.7 TWhDemand 20.0 TWhClean 76%Intensity 159 gCO₂/kWhNet importer 5.3 TWh

Ember · source · CC-BY-4.0

On the interactive map

Open the interactive map →

Browse by asset class

Under construction & proposed

Largest assets

Biggest owners & operators

Counts an asset once per company named as its owner or operator; a joint venture counts for each partner.

Frequently asked

How many energy assets does Croatia have?
OverWatts maps 58 in Croatia across 7 asset classes — the 81st-largest mapped base of the 157 countries covered.
How much electricity generation capacity does Croatia have?
About 3.0 GW operating across 12 plants, mostly hydro 40%, gas 29% and wind 13%.
Who owns Croatia's energy infrastructure?
Plinacro Ltd is named as owner or operator on the most mapped assets (18), followed by HEP Generation Ltd (7), Hrvatska elektroprivreda dd (5) and HEP-Proizvodnja doo (3).
What energy projects are under construction in Croatia?
The largest under way or proposed are Croatia – Serbia interconnection (planned) (600 MW), Blaca Pumped Storage hydroelectric plant (498 MW) and Lički Medvjed wind farm (425 MW).