Browse the atlas
Asset classes
- Transmission Line80,968
- Power Plant32,429
- Substation / Converter7,614
- Oil & Gas Field7,055
- Coal / Uranium Mine5,382
- Pipeline4,951
- Cement Plant3,513
- Data Centre3,283
- Iron & Steel Plant1,293
- LNG Terminal1,198
- Grid Storage965
- Iron Ore Mine949
- Chemical Plant868
- Interconnector704
- Export Terminal519
- Refinery279
- Storage / Tank Farm38
- Oil / Commodity Contract19
- Hydrogen Project18
- Carbon Capture (CCS)16
Chokepoints
Croatia — Energy Infrastructure
OverWatts maps 58 energy assets in Croatia across 7 layers — the 81st-largest mapped base of 157 countries. They include 22 power plants, 16 pipelines and 6 LNG terminals. Operating generation capacity is 3.0 GW, led by hydro at 40%.
The companies named on the most assets are Plinacro Ltd (18), HEP Generation Ltd (7) and Hrvatska elektroprivreda dd (5), counting both ownership and operatorship. Half of Croatia's mapped assets in service predate 1984 (median commissioning year of the 26 with a known date), 11 came online in the past decade and the oldest still listed is Sv Kajo Cement Plant, dating from 1904. 15 projects are under construction or proposed, led by Croatia – Serbia interconnection (planned) (600 MW).
Operating generation capacity by fuel
Utility-scale sites of 100 MW and above. Distributed generation — rooftop solar especially — is outside the tracker, so this runs below national installed capacity.
- hydro1.2 GW +910 MW planned
- gas883 MW
- wind397 MW +815 MW planned
- oil320 MW
- coal217 MW +125 MW planned
- solar0 MW +616 MW planned
Electricity generated by fuel · 2025
What the fleet actually produced — distinct from the installed capacity above.
- hydro5.8 TWh 39%
- wind3.1 TWh 21%
- gas2.8 TWh 19%
- solar1.3 TWh 9%
- biomass1.0 TWh 7%
- coal700 GWh 5%
Ember · source · CC-BY-4.0
On the interactive map
Browse by asset class
Under construction & proposed
- Croatia – Serbia interconnection (planned)Interconnectors · 600 MW · 2040
- Blaca Pumped Storage hydroelectric plantPower Plants · 498 MW · hydro
- Blaca Pumped Storage hydroelectric plantGrid Storage · 498 MW
- Lički Medvjed wind farmPower Plants · 425 MW · wind · 2026
- Senj II hydroelectric plantPower Plants · 412 MW · hydro
- Kutnjak solar farmPower Plants · 297 MW · solar · 2026
- Promina solar farmPower Plants · 189 MW · solar · 2027
- Brda Umovi wind farmPower Plants · 156 MW · wind · 2026
- Obrovac Sinjski solar farmPower Plants · 130 MW · solar
- Ljubovo wind farmPower Plants · 120 MW · wind · 2028
- Udbina wind farmPower Plants · 114 MW · wind
- Krk FSRULNG Terminals · 3.01 Mtpa · 2030
- Krk FSRULNG Terminals · 2.35 Mtpa · 2024
- Croatia-Slovenia Interconnector Gas Pipeline — Jezerisce-SotlaPipelines · 2030
- Omišalj-Zlobin-Bosiljevo-Sisak-Kozarac-Slobodnica LNG main evacuation pipeline — Kozarac-SlobodnicaPipelines · 2030
Largest assets
- Croatia – Slovenia interconnectionInterconnectors · 2.0 GW
- Croatia – Hungary interconnectionInterconnectors · 1.7 GW
- Croatia – Serbia interconnection (planned)Interconnectors · 600 MW · 2040
- Zakučac hydroelectric plantPower Plants · 538 MW · hydro · 1961
- Croatia – Serbia interconnectionInterconnectors · 500 MW
- Blaca Pumped Storage hydroelectric plantPower Plants · 498 MW · hydro
- Blaca Pumped Storage hydroelectric plantGrid Storage · 498 MW
- Lički Medvjed wind farmPower Plants · 425 MW · wind · 2026
- Te-To Zagreb power stationPower Plants · 420 MW · gas · 1979
- Senj II hydroelectric plantPower Plants · 412 MW · hydro
- Rijeka power stationPower Plants · 320 MW · oil · 1978
- Kutnjak solar farmPower Plants · 297 MW · solar · 2026
- Velebit hydroelectric plantPower Plants · 240 MW · hydro · 1984
- Velebit hydroelectric plantGrid Storage · 240 MW · 1984
- Orlovac hydroelectric plantPower Plants · 237 MW · hydro · 1973
- Sisak power stationPower Plants · 235 MW · gas · 2017
- El-To Zagreb power stationPower Plants · 228 MW · gas · 1980
- Plomin power stationPower Plants · 217 MW · coal · 2000
- Senj I hydroelectric plantPower Plants · 216 MW · hydro · 1965
- Promina solar farmPower Plants · 189 MW · solar · 2027
- Brda Umovi wind farmPower Plants · 156 MW · wind · 2026
- Senj (Norinco) wind farmPower Plants · 156 MW · wind · 2021
- Obrovac Sinjski solar farmPower Plants · 130 MW · solar
- KRS-Padene wind farmPower Plants · 130 MW · wind · 2021
- Plomin power stationPower Plants · 125 MW · coal · 1969
Biggest owners & operators
- Plinacro Ltd18 31%
- HEP Generation Ltd7 12%
- Hrvatska elektroprivreda dd5 9%
- HEP-Proizvodnja doo3 5%
- CEMEX Hrvatska dd2 3%
- CEMEX SAB de CV2 3%
- DTEK Group BV2 3%
- Golar LNG2 3%
Counts an asset once per company named as its owner or operator; a joint venture counts for each partner.
Frequently asked
- How many energy assets does Croatia have?
- OverWatts maps 58 in Croatia across 7 asset classes — the 81st-largest mapped base of the 157 countries covered.
- How much electricity generation capacity does Croatia have?
- About 3.0 GW operating across 12 plants, mostly hydro 40%, gas 29% and wind 13%.
- Who owns Croatia's energy infrastructure?
- Plinacro Ltd is named as owner or operator on the most mapped assets (18), followed by HEP Generation Ltd (7), Hrvatska elektroprivreda dd (5) and HEP-Proizvodnja doo (3).
- What energy projects are under construction in Croatia?
- The largest under way or proposed are Croatia – Serbia interconnection (planned) (600 MW), Blaca Pumped Storage hydroelectric plant (498 MW) and Lički Medvjed wind farm (425 MW).