Croatia · asset class

Interconnectors in Croatia

Croatia has 4 interconnectors mapped on the OverWatts open energy atlas — the 35th-largest fleet of the 104 countries that hold any, and 0.6% of the world's mapped total. Of these, 3 operating and 1 under construction or proposed. The largest is Croatia – Slovenia interconnection (2.0 GW).

1 is in the pipeline, led by Croatia – Serbia interconnection (planned) (600 MW), proposed. They account for 7% of every energy asset OverWatts maps in Croatia.

4
Interconnector in Croatia
#35
of 104 countries
1
In construction / proposed

On the interactive map

Open the interactive map →

Largest interconnectors in Croatia

Under construction & proposed

How Croatia compares · interconnectors by country

Frequently asked

How many interconnectors are there in Croatia?
OverWatts maps 4 interconnectors in Croatia — 0.6% of the world's mapped total, the 35th-largest national fleet of the 104 countries with any.
What is the largest interconnector in Croatia?
Croatia – Slovenia interconnection, at 2.0 GW.
What new interconnectors are being built in Croatia?
1 project is under construction or proposed. The largest is Croatia – Serbia interconnection (planned) (600 MW).

Other asset classes in Croatia

Interconnectors in other countries