Browse the atlas
Asset classes
- Transmission Line80,968
- Power Plant32,429
- Substation / Converter7,614
- Oil & Gas Field7,055
- Coal / Uranium Mine5,382
- Pipeline4,951
- Cement Plant3,513
- Data Centre3,283
- Iron & Steel Plant1,293
- LNG Terminal1,198
- Grid Storage965
- Iron Ore Mine949
- Chemical Plant868
- Interconnector704
- Export Terminal519
- Refinery279
- Storage / Tank Farm38
- Oil / Commodity Contract19
- Hydrogen Project18
- Carbon Capture (CCS)16
Chokepoints
Spain · asset class
Power Plants in Spain
Spain has 653 power plants mapped on the OverWatts open energy atlas — the 5th-largest fleet of the 155 countries that hold any, and 2% of the world's mapped total. Of these, 183 operating and 445 under construction or proposed. Operating generation capacity totals 65.9 GW across 183 utility-scale plants of 100 MW and above. The largest is HyDeal España solar farm (9.5 GW).
The largest owner-operators are Iberdrola SA (59), Endesa SA (35) and Naturgy Energy Group SA (21) — Iberdrola SA alone is named on 9% of them. Half of Spain's power plants in service predate 2007 (median commissioning year of the 172 with a known date), 66 came online in the past decade and the oldest still listed is Ricobayo I hydroelectric plant, dating from 1934. 445 are in the pipeline, led by HyDeal España solar farm (9.5 GW), proposed. They account for 78% of every energy asset OverWatts maps in Spain.
Operating generation capacity by fuel
- gas27.6 GW
- solar12.9 GW +84.2 GW planned
- hydro12.1 GW +6.4 GW planned
- nuclear7.4 GW +1.1 GW planned
- wind3.5 GW +36.3 GW planned
- oil2.0 GW +200 MW planned
- coal335 MW +13.4 GW planned
- biomass137 MW
On the interactive map
Largest power plants in Spain
- HyDeal España solar farm9.5 GW · solar · 2028 · proposed
- Zaragoza and Teruel solar farm2.6 GW · solar · construction
- Almaraz nuclear power plant2.1 GW · nuclear · 1983
- Ascó nuclear power plant2.1 GW · nuclear · 1984
- Andalusian Green Hydrogen Valley wind farm1.8 GW · wind · 2027 · proposed
- Conso II hydroelectric plant1.8 GW · hydro · proposed
- Castellón power station1.6 GW · gas · 2002
- Arcos de la Frontera power station1.6 GW · gas · 2005
- As Pontes power station1.5 GW · coal · 1976 · idle
- Compostilla power station1.3 GW · coal · 1961 · idle
- Cartagena (Escombreras) power station1.2 GW · gas · 2006
- Sagunto power station1.2 GW · gas · 2007
- Castejón power station1.2 GW · gas · 2002
- Nudo Mudéjar de Andorra solar farm1.2 GW · solar · 2027 · construction
- Erasmo solar farm1.2 GW · solar · 2029 · construction
- Catwind Floating wind farm1.2 GW · wind · proposed
- Nordés Offshore Floating wind farm1.2 GW · wind · construction
- El Fangal power station1.2 GW · gas · 2006
- Palos power station1.2 GW · gas · 2004
- Litoral de Almería power station1.2 GW · coal · 1985 · idle
- Cofrentes nuclear power plant1.1 GW · nuclear · 1985
- Teruel power station1.1 GW · coal · 1979 · idle
- Hive H2 Albamed solar farm1.1 GW · solar · 2027 · proposed
- Vandellos nuclear power plant1.1 GW · nuclear · 1988
- As Pontes (Endesa) wind farm1.1 GW · wind · proposed
- Norfeu Floating Offshore wind farm1.1 GW · wind · construction
- Trillo nuclear power plant1.1 GW · nuclear · 1988
- Ibercerrato wind farm1.0 GW · wind · 2026 · construction
- Galwind Floating wind farm1.0 GW · wind · construction
- Aguayo II hydroelectric plant1.0 GW · hydro · 2030 · construction
- Nao Victoria Floating Offshore wind farm990 MW · wind · 2029 · construction
- Guadalteba wind farm970 MW · wind · construction
- José María Oriol hydroelectric plant957 MW · hydro · 1969
- Aboño power station916 MW · coal · 1974 · idle
- Catalina Green Hydrogen wind farm898 MW · wind · 2029 · construction
- Cortes La Muela II hydroelectric plant882 MW · hydro · 2013
- Puerto De Barcelona power station866 MW · gas · 2003
- Besós 5 power station859 MW · gas · 2010
- As Pontes power station856 MW · gas · 2008
- Soto de Ribera power station854 MW · gas · 2008
- Plana del Vent power station834 MW · gas · 2007
- Bahia de Algeciras power station821 MW · gas · 2011
- Escombreras Iberdrola power station816 MW · gas · 2006
- Xistral Floating Offshore wind farm810 MW · wind · construction
- Aldeadàvila hydroelectric plant810 MW · hydro · 1963
- Villarino hydroelectric plant810 MW · hydro · 1970
- Escatrón 3 power station804 MW · gas · 2007
- Castelnou power station800 MW · gas · 2006
- Amorebieta power station786 MW · gas · 2005
- Arrubal power station785 MW · gas · 2005
- Bahía de Bizkaia power station785 MW · gas · 2003
- Villaviciosa solar farm782 MW · solar · construction
- Campo de Gibraltar power station781 MW · gas · 2004
- Bahia de Algeciras power station753 MW · coal · 1970 · idle
- Granadilla power station749 MW · oil · 1990
- Aura Solar (Spain) solar farm700 MW · solar · construction
- Barranco de Tirajana power station697 MW · gas · 1992
- Nudo Mudéjar de Andorra wind farm695 MW · wind · 2027 · construction
- Plan Futuro Andorra wind farm695 MW · wind · 2027 · construction
- Agr Maria solar farm674 MW · solar · construction
- Soto de Ribera power station672 MW · coal · 1962 · idle
- La Robla Fenosa power station655 MW · coal · 1971 · idle
- Breixo Floating Offshore wind farm648 MW · wind · construction
- Entrepeñas Pumped Storage hydroelectric plant644 MW · hydro · proposed
- Cortes La Muela I hydroelectric plant635 MW · hydro · 1989
- Cifuentes-Trillo solar farm626 MW · solar · 2023
- Trillo Node solar farm626 MW · solar · 2023
- Ventas de Huelma solar farm600 MW · solar · construction
- Ventus Offshore wind farm600 MW · wind · construction
- Garoña solar farm595 MW · solar · construction
- Narcea power station595 MW · coal · 1965 · idle
- Roleira Floating Offshore wind farm594 MW · wind · construction
- Puertollano power station590 MW · coal · 1972 · idle
- Los Barrios power station589 MW · coal · 1985 · idle
- Castilla Y León solar farm585 MW · solar · 2026 · construction
- Meirama power station580 MW · coal · 1980 · idle
- Lada power station563 MW · coal · 1951 · idle
- Francisco Pizarro solar farm553 MW · solar · 2022
- O Boi Floating Offshore wind farm552 MW · wind · construction
- Catalina Green Hydrogen solar farm550 MW · solar · 2028 · proposed
- Valladolid, Palencia, and Soria solar farm550 MW · solar · construction
- Valle (ISC Greenfield) solar farm547 MW · solar · construction
- Helena solar farm543 MW · solar · 2026 · construction
- Pinzón Floating Offshore wind farm540 MW · wind · construction
- Castilla y León hybrid wind farm535 MW · wind · 2026 · construction
- Atlántico-1 Offshore wind farm525 MW · wind · construction
- Juan Sebastián Elcano wind farm522 MW · wind · proposed
- Campus Data Center CCGreen solar farm520 MW · solar · 2030 · proposed
- Velilla del Río Carrión power station516 MW · coal · 1964 · idle
- Envatios XXII solar farm514 MW · solar · construction
- La Baells hydroelectric plant512 MW · hydro · proposed
- Breogán Floating Offshore wind farm510 MW · wind · construction
- Celta II Floating Offshore wind farm510 MW · wind · construction
- Volanteiro Floating Offshore wind farm510 MW · wind · 2029 · construction
- Vandellos nuclear power plant500 MW · nuclear · 1972 · idle
- Núñez De Balboa solar farm500 MW · solar · 2020
- Canawind Floating wind farm500 MW · wind · construction
- Gavina Floating Offshore wind farm500 MW · wind · 2030 · construction
- Parc Tramuntana offshore wind farm500 MW · wind · 2027 · construction
- Cedillo hydroelectric plant500 MW · hydro · 1978
Who owns Spain's power plants
- Iberdrola SA59 9%
- Endesa SA35 5%
- Naturgy Energy Group SA21 3%
- Capital Energy20 3%
- Iberdrola Renovables Energia15 2%
- Bruc Iberia Energy Investment Partners14 2%
- Compañía Española de Petróleos SA14 2%
- Grupo Ibereólica Renovables14 2%
Counts an asset once per company named as its owner or operator; a joint venture counts for each partner.
When they were built
- 1930s1
- 1950s6
- 1960s10
- 1970s14
- 1980s16
- 1990s9
- 2000s41
- 2010s16
- 2020s59
Median commissioning year 2007 · oldest Ricobayo I hydroelectric plant (1934) · newest Pinta wind farm (2025) · 172 of 653 carry a start date
Under construction & proposed
- HyDeal España solar farm9.5 GW · solar · 2028 · proposed
- Zaragoza and Teruel solar farm2.6 GW · solar · construction
- Andalusian Green Hydrogen Valley wind farm1.8 GW · wind · 2027 · proposed
- Conso II hydroelectric plant1.8 GW · hydro · proposed
- Nudo Mudéjar de Andorra solar farm1.2 GW · solar · 2027 · construction
- Erasmo solar farm1.2 GW · solar · 2029 · construction
- Catwind Floating wind farm1.2 GW · wind · proposed
- Nordés Offshore Floating wind farm1.2 GW · wind · construction
- Hive H2 Albamed solar farm1.1 GW · solar · 2027 · proposed
- As Pontes (Endesa) wind farm1.1 GW · wind · proposed
- Norfeu Floating Offshore wind farm1.1 GW · wind · construction
- Ibercerrato wind farm1.0 GW · wind · 2026 · construction
How Spain compares · power plants by country
- 1. China11,537
- 2. United States3,831
- 3. India1,675
- 4. Brazil879
- 5. Spain653
- 6. Australia615
- 7. Philippines489
- 8. Russia461
Frequently asked
- How many power plants are there in Spain?
- OverWatts maps 653 power plants in Spain — 2% of the world's mapped total, the 5th-largest national fleet of the 155 countries with any.
- What is the largest power plant in Spain?
- HyDeal España solar farm, at 9.5 GW.
- How much power-generation capacity do Spain's power plants have?
- About 65.9 GW operating across 183 plants, with a further 142 GW under construction or proposed. That covers utility-scale sites of 100 MW and above, so it sits below national installed capacity wherever distributed generation is large.
- Who owns the power plants in Spain?
- Iberdrola SA is named as owner or operator on the most — 59 of 653 (9%). Next are Endesa SA (35), Naturgy Energy Group SA (21) and Capital Energy (20).
- How old are Spain's power plants?
- The median commissioning year is 2007, across the 172 in service with a known start date. The oldest still listed is Ricobayo I hydroelectric plant (1934); 66 came online in the past ten years.
- What new power plants are being built in Spain?
- 445 projects are under construction or proposed. The largest are HyDeal España solar farm (9.5 GW), Zaragoza and Teruel solar farm (2.6 GW) and Andalusian Green Hydrogen Valley wind farm (1.8 GW).