Browse the atlas
Asset classes
- Transmission Line80,968
- Power Plant32,429
- Substation / Converter7,614
- Oil & Gas Field7,055
- Coal / Uranium Mine5,382
- Pipeline4,951
- Cement Plant3,513
- Data Centre3,283
- Iron & Steel Plant1,293
- LNG Terminal1,198
- Grid Storage965
- Iron Ore Mine949
- Chemical Plant868
- Interconnector704
- Export Terminal519
- Refinery279
- Storage / Tank Farm38
- Oil / Commodity Contract19
- Hydrogen Project18
- Carbon Capture (CCS)16
Chokepoints
Spain — Energy Infrastructure
OverWatts maps 839 energy assets in Spain across 13 layers — the 9th-largest mapped base of 157 countries. They include 653 power plants, 51 pipelines and 41 cement plants. Operating generation capacity is 65.9 GW, led by gas at 42%. Refining capacity is about 1,224 kb/d.
The companies named on the most assets are Iberdrola SA (75), Enagás (60) and Endesa SA (39), counting both ownership and operatorship. Half of Spain's mapped assets in service predate 2002 (median commissioning year of the 300 with a known date), 71 came online in the past decade and the oldest still listed is Añorga Cement Plant, dating from 1901. 40+ projects are under construction or proposed, led by HyDeal España solar farm (9.5 GW).
Operating generation capacity by fuel
Utility-scale sites of 100 MW and above. Distributed generation — rooftop solar especially — is outside the tracker, so this runs below national installed capacity.
- gas27.6 GW
- solar12.9 GW +84.2 GW planned
- hydro12.1 GW +6.4 GW planned
- nuclear7.4 GW +1.1 GW planned
- wind3.5 GW +36.3 GW planned
- oil2.0 GW +200 MW planned
- coal335 MW +13.4 GW planned
- biomass137 MW
Electricity generated by fuel · 2025
What the fleet actually produced — distinct from the installed capacity above.
- solar62.9 TWh 22%
- gas62.1 TWh 22%
- wind58.8 TWh 20%
- nuclear54.1 TWh 19%
- hydro32.8 TWh 11%
- oil10.0 TWh 3%
- biomass6.4 TWh 2%
- coal900 GWh 0%
Ember · source · CC-BY-4.0
On the interactive map
Browse by asset class
Under construction & proposed
- HyDeal España solar farmPower Plants · 9.5 GW · solar · 2028
- Zaragoza and Teruel solar farmPower Plants · 2.6 GW · solar
- Spain – France interconnection (planned)Interconnectors · 2.2 GW · 2025
- Spain – Portugal interconnection (planned)Interconnectors · 1.9 GW · 2025
- Andalusian Green Hydrogen Valley wind farmPower Plants · 1.8 GW · wind · 2027
- Conso II hydroelectric plantPower Plants · 1.8 GW · hydro
- Conso II hydroelectric plantGrid Storage · 1.8 GW
- Spain – France interconnection (planned)Interconnectors · 1.5 GW · 2040
- Spain – France interconnection (planned)Interconnectors · 1.5 GW · 2045
- Nudo Mudéjar de Andorra solar farmPower Plants · 1.2 GW · solar · 2027
- Erasmo solar farmPower Plants · 1.2 GW · solar · 2029
- Catwind Floating wind farmPower Plants · 1.2 GW · wind
- Nordés Offshore Floating wind farmPower Plants · 1.2 GW · wind
- Hive H2 Albamed solar farmPower Plants · 1.1 GW · solar · 2027
- As Pontes (Endesa) wind farmPower Plants · 1.1 GW · wind
- Norfeu Floating Offshore wind farmPower Plants · 1.1 GW · wind
- Ibercerrato wind farmPower Plants · 1.0 GW · wind · 2026
- Galwind Floating wind farmPower Plants · 1.0 GW · wind
- Aguayo II hydroelectric plantPower Plants · 1.0 GW · hydro · 2030
- Aguayo II hydroelectric plantGrid Storage · 1.0 GW · 2030
- Nao Victoria Floating Offshore wind farmPower Plants · 990 MW · wind · 2029
- Guadalteba wind farmPower Plants · 970 MW · wind
- Catalina Green Hydrogen wind farmPower Plants · 898 MW · wind · 2029
- Xistral Floating Offshore wind farmPower Plants · 810 MW · wind
- Villaviciosa solar farmPower Plants · 782 MW · solar
- Aura Solar (Spain) solar farmPower Plants · 700 MW · solar
- Nudo Mudéjar de Andorra wind farmPower Plants · 695 MW · wind · 2027
- Plan Futuro Andorra wind farmPower Plants · 695 MW · wind · 2027
- Agr Maria solar farmPower Plants · 674 MW · solar
- Breixo Floating Offshore wind farmPower Plants · 648 MW · wind
- Entrepeñas Pumped Storage hydroelectric plantPower Plants · 644 MW · hydro
- Entrepeñas Pumped Storage hydroelectric plantGrid Storage · 644 MW
- Ventas de Huelma solar farmPower Plants · 600 MW · solar
- Ventus Offshore wind farmPower Plants · 600 MW · wind
- Garoña solar farmPower Plants · 595 MW · solar
- Roleira Floating Offshore wind farmPower Plants · 594 MW · wind
- Castilla Y León solar farmPower Plants · 585 MW · solar · 2026
- O Boi Floating Offshore wind farmPower Plants · 552 MW · wind
- Catalina Green Hydrogen solar farmPower Plants · 550 MW · solar · 2028
- Valladolid, Palencia, and Soria solar farmPower Plants · 550 MW · solar
Largest assets
- HyDeal España solar farmPower Plants · 9.5 GW · solar · 2028
- Spain – France interconnectionInterconnectors · 2.8 GW
- Spain – Portugal interconnectionInterconnectors · 2.7 GW
- Zaragoza and Teruel solar farmPower Plants · 2.6 GW · solar
- Spain – France interconnection (planned)Interconnectors · 2.2 GW · 2025
- Almaraz nuclear power plantPower Plants · 2.1 GW · nuclear · 1983
- Ascó nuclear power plantPower Plants · 2.1 GW · nuclear · 1984
- Spain – Portugal interconnection (planned)Interconnectors · 1.9 GW · 2025
- Andalusian Green Hydrogen Valley wind farmPower Plants · 1.8 GW · wind · 2027
- Conso II hydroelectric plantPower Plants · 1.8 GW · hydro
- Conso II hydroelectric plantGrid Storage · 1.8 GW
- Castellón power stationPower Plants · 1.6 GW · gas · 2002
- Arcos de la Frontera power stationPower Plants · 1.6 GW · gas · 2005
- Spain – France interconnection (planned)Interconnectors · 1.5 GW · 2040
- Spain – France interconnection (planned)Interconnectors · 1.5 GW · 2045
- As Pontes power stationPower Plants · 1.5 GW · coal · 1976
- Algeciras (San Roque)Refineries · 240 kb/d
- Spain – Morocco interconnectionInterconnectors · 1.4 GW
- Compostilla power stationPower Plants · 1.3 GW · coal · 1961
- Cartagena RefineryRefineries · 220 kb/d
- Petronor RefineryRefineries · 220 kb/d
- Cartagena (Escombreras) power stationPower Plants · 1.2 GW · gas · 2006
- Sagunto power stationPower Plants · 1.2 GW · gas · 2007
- Castejón power stationPower Plants · 1.2 GW · gas · 2002
- Nudo Mudéjar de Andorra solar farmPower Plants · 1.2 GW · solar · 2027
Biggest owners & operators
- Iberdrola SA75 9%
- Enagás60 7%
- Endesa SA39 5%
- Capital Energy21 3%
- Naturgy Energy Group SA21 3%
- Repsol SA17 2%
- Enel Green Power16 2%
- Iberdrola Renovables Energia15 2%
Counts an asset once per company named as its owner or operator; a joint venture counts for each partner.
Frequently asked
- How many energy assets does Spain have?
- OverWatts maps 839 in Spain across 13 asset classes — the 9th-largest mapped base of the 157 countries covered.
- How much electricity generation capacity does Spain have?
- About 65.9 GW operating across 183 plants, mostly gas 42%, solar 20% and hydro 18%.
- Who owns Spain's energy infrastructure?
- Iberdrola SA is named as owner or operator on the most mapped assets (75), followed by Enagás (60), Endesa SA (39) and Capital Energy (21).
- What energy projects are under construction in Spain?
- The largest under way or proposed are HyDeal España solar farm (9.5 GW), Zaragoza and Teruel solar farm (2.6 GW) and Spain – France interconnection (planned) (2.2 GW).