- Transmission Line80,968
- Power Plant32,429
- Substation / Converter7,614
- Oil & Gas Field7,055
- Coal / Uranium Mine5,382
- Pipeline4,951
- Cement Plant3,513
- Data Centre3,283
- Iron & Steel Plant1,293
- LNG Terminal1,198
- Grid Storage965
- Iron Ore Mine949
- Chemical Plant868
- Interconnector704
- Export Terminal519
- Refinery279
- Storage / Tank Farm38
- Oil / Commodity Contract19
- Hydrogen Project18
- Carbon Capture (CCS)16
Chokepoints
Dominican Republic · asset class
Power Plants in Dominican Republic
Dominican Republic has 37 power plants mapped on the OverWatts open energy atlas — the 68th-largest fleet of the 155 countries that hold any, and 0.1% of the world's mapped total. Of these, 19 operating and 18 under construction or proposed. Operating generation capacity totals 4.2 GW across 19 utility-scale plants of 100 MW and above. The largest is Punta Catalina power station (752 MW).
The largest owner-operators are Empresa Generadora de Electricidad Haina SA (6), Coastal Petroleum Dominicana SA (3) and Transcontinental Capital Corporation (Bermuda) Ltd (3) — Empresa Generadora de Electricidad Haina SA alone is named on 16% of them. Half of Dominican Republic's power plants in service predate 2019 (median commissioning year of the 19 with a known date), 11 came online in the past decade and the oldest still listed is Falcondo mine power station, dating from 1972. 18 are in the pipeline, led by San Felipe power station (470 MW), under construction. They account for 76% of every energy asset OverWatts maps in Dominican Republic.
Operating generation capacity by fuel
- gas2.1 GW +2.0 GW planned
- coal1.0 GW
- oil660 MW
- solar414 MW +1.4 GW planned
- hydro0 MW +204 MW planned
- wind0 MW +100 MW planned
On the interactive map
Largest power plants in Dominican Republic
- Punta Catalina power station752 MW · coal · 2019
- San Felipe power station470 MW · gas · 2027 · construction
- Manzanillo Power Land power station432 MW · gas · 2026 · construction
- Manzanillo Energy power station420 MW · gas · 2027 · construction
- Manzanillo Gas & Power power station420 MW · gas · 2027 · construction
- Los Mina power station359 MW · gas · 2017
- Andrés power station319 MW · gas · 2003
- San Pedro de Macorís power station300 MW · gas · 2020
- Itabo power station260 MW · coal · 1984
- Las Parras solar farm248 MW · solar · 2027 · construction
- Quisqueya 1 power station225 MW · gas · 2020
- Quisqueya 2 power station225 MW · gas · 2020
- Siba power station210 MW · gas · 2023
- Las Placetas hydroelectric plant204 MW · hydro · construction
- Falcondo mine power station198 MW · oil · 1972
- Powership Azua power station177 MW · gas · 2023
- Baní solar farm160 MW · solar · 2027 · construction
- Sultana del Este power station154 MW · oil · 2001
- Guayubín solar farm151 MW · solar · proposed
- Estrella del Mar III power station150 MW · gas · 2022
- Mata De Palma Washington Solar Park150 MW · solar · 2019
- Estrella del Mar IV power station145 MW · gas · 2028 · proposed
- Dicayagua solar farm145 MW · solar · construction
- Cotoperí solar farm144 MW · solar · 2025
- Peravia solar farm140 MW · solar · construction
- San Pedro de Macorís power station130 MW · gas · 2026 · construction
- Quisqueya Verde solar farm125 MW · solar · proposed
- Girasol Solar Park120 MW · solar · 2021
- Pimentel Energy solar farm120 MW · solar · 2027 · construction
- Estrella del Mar II power station111 MW · gas · 2012
- Palamara power station107 MW · oil · 2001
- Monte Rio power station101 MW · oil · 2003
- Río Haina power station100 MW · oil · 1998
- Coastal Solar Project100 MW · solar · construction
- Mirasol solar farm100 MW · solar · construction
- Payita solar farm100 MW · solar · construction
- Sajoma wind farm100 MW · wind · proposed
Who owns Dominican Republic's power plants
- Empresa Generadora de Electricidad Haina SA6 16%
- Coastal Petroleum Dominicana SA3 8%
- Transcontinental Capital Corporation (Bermuda) Ltd3 8%
- AES Corp2 5%
- Compañía de Electricidad de San Pedro de Macorís2 5%
- Estrella-Linda Group2 5%
- Manzanillo Energy SAS2 5%
- MEDCAP Energy Caribe2 5%
Counts an asset once per company named as its owner or operator; a joint venture counts for each partner.
When they were built
- 1970s1
- 1980s1
- 1990s1
- 2000s4
- 2010s4
- 2020s8
Median commissioning year 2019 · oldest Falcondo mine power station (1972) · newest Cotoperí solar farm (2025) · 19 of 37 carry a start date
Under construction & proposed
- San Felipe power station470 MW · gas · 2027 · construction
- Manzanillo Power Land power station432 MW · gas · 2026 · construction
- Manzanillo Energy power station420 MW · gas · 2027 · construction
- Manzanillo Gas & Power power station420 MW · gas · 2027 · construction
- Las Parras solar farm248 MW · solar · 2027 · construction
- Las Placetas hydroelectric plant204 MW · hydro · construction
- Baní solar farm160 MW · solar · 2027 · construction
- Guayubín solar farm151 MW · solar · proposed
- Estrella del Mar IV power station145 MW · gas · 2028 · proposed
- Dicayagua solar farm145 MW · solar · construction
- Peravia solar farm140 MW · solar · construction
- San Pedro de Macorís power station130 MW · gas · 2026 · construction
How Dominican Republic compares · power plants by country
- 1. China11,537
- 65. Syria41
- 66. Venezuela41
- 67. Zambia39
- 68. Dominican Republic37
- 69. Ethiopia34
- 70. Kyrgyzstan34
- 71. Tanzania34
Frequently asked
- How many power plants are there in Dominican Republic?
- OverWatts maps 37 power plants in Dominican Republic — 0.1% of the world's mapped total, the 68th-largest national fleet of the 155 countries with any.
- What is the largest power plant in Dominican Republic?
- Punta Catalina power station, at 752 MW.
- How much power-generation capacity do Dominican Republic's power plants have?
- About 4.2 GW operating across 19 plants, with a further 3.7 GW under construction or proposed. That covers utility-scale sites of 100 MW and above, so it sits below national installed capacity wherever distributed generation is large.
- Who owns the power plants in Dominican Republic?
- Empresa Generadora de Electricidad Haina SA is named as owner or operator on the most — 6 of 37 (16%). Next are Coastal Petroleum Dominicana SA (3), Transcontinental Capital Corporation (Bermuda) Ltd (3) and AES Corp (2).
- How old are Dominican Republic's power plants?
- The median commissioning year is 2019, across the 19 in service with a known start date. The oldest still listed is Falcondo mine power station (1972); 11 came online in the past ten years.
- What new power plants are being built in Dominican Republic?
- 18 projects are under construction or proposed. The largest are San Felipe power station (470 MW), Manzanillo Power Land power station (432 MW) and Manzanillo Energy power station (420 MW).