Dominican Republic — Energy Infrastructure

OverWatts maps 49 energy assets in Dominican Republic across 4 layers — the 88th-largest mapped base of 157 countries. They include 37 power plants, 8 cement plants and 3 LNG terminals. Operating generation capacity is 4.2 GW, led by gas at 50%.

The companies named on the most assets are Empresa Generadora de Electricidad Haina SA (6), AES Corp (3) and Coastal Petroleum Dominicana SA (3), counting both ownership and operatorship. Half of Dominican Republic's mapped assets in service predate 2012 (median commissioning year of the 27 with a known date), 12 came online in the past decade and the oldest still listed is Falcondo mine power station, dating from 1972. 20 projects are under construction or proposed, led by San Felipe power station (470 MW).

49
Total assets
#88
of 157 countries
4.2 GW
operating · 37 power plants
4
LNG Mtpa
20
In construction / proposed

Operating generation capacity by fuel

Utility-scale sites of 100 MW and above. Distributed generation — rooftop solar especially — is outside the tracker, so this runs below national installed capacity.

Electricity generated by fuel · 2025

What the fleet actually produced — distinct from the installed capacity above.

Total 22.7 TWhDemand 22.7 TWhClean 24%Intensity 537 gCO₂/kWh

Ember · source · CC-BY-4.0

On the interactive map

Open the interactive map →

Browse by asset class

Under construction & proposed

Largest assets

Biggest owners & operators

Counts an asset once per company named as its owner or operator; a joint venture counts for each partner.

Frequently asked

How many energy assets does Dominican Republic have?
OverWatts maps 49 in Dominican Republic across 4 asset classes — the 88th-largest mapped base of the 157 countries covered.
How much electricity generation capacity does Dominican Republic have?
About 4.2 GW operating across 19 plants, mostly gas 50%, coal 24% and oil 16%.
Who owns Dominican Republic's energy infrastructure?
Empresa Generadora de Electricidad Haina SA is named as owner or operator on the most mapped assets (6), followed by AES Corp (3), Coastal Petroleum Dominicana SA (3) and Transcontinental Capital Corporation (Bermuda) Ltd (3).
What energy projects are under construction in Dominican Republic?
The largest under way or proposed are San Felipe power station (470 MW), Manzanillo Power Land power station (432 MW) and Manzanillo Energy power station (420 MW).