Bosnia and Herzegovina · asset class

Power Plants in Bosnia and Herzegovina

Bosnia and Herzegovina has 42 power plants mapped on the OverWatts open energy atlas — the 64th-largest fleet of the 155 countries that hold any, and 0.1% of the world's mapped total. Of these, 14 operating and 27 under construction or proposed. Operating generation capacity totals 3.9 GW across 14 utility-scale plants of 100 MW and above. The largest is Ugljevik power station (700 MW).

The largest owner-operators are Elektroprivreda Republike Srpske (ERS) (6), Pension Reserve Fund of the Republic of Srpska (5) and Republic of Srpska Restitution Fund (5) — Elektroprivreda Republike Srpske (ERS) alone is named on 14% of them. Half of Bosnia and Herzegovina's power plants in service predate 1981 (median commissioning year of the 14 with a known date), 1 came online in the past decade and the oldest still listed is Jablanica hydroelectric plant, dating from 1955. 27 are in the pipeline, led by Ugljevik power station (700 MW), under construction. They account for 58% of every energy asset OverWatts maps in Bosnia and Herzegovina.

42
Power Plant in Bosnia and Herzegovina
#64
of 155 countries
3.9 GW
Operating capacity
27
In construction / proposed

Operating generation capacity by fuel

On the interactive map

Open the interactive map →

Largest power plants in Bosnia and Herzegovina

Who owns Bosnia and Herzegovina's power plants

Counts an asset once per company named as its owner or operator; a joint venture counts for each partner.

When they were built

Median commissioning year 1981 · oldest Jablanica hydroelectric plant (1955) · newest Stanari Thermal Power Plant (2016) · 14 of 42 carry a start date

Under construction & proposed

How Bosnia and Herzegovina compares · power plants by country

Frequently asked

How many power plants are there in Bosnia and Herzegovina?
OverWatts maps 42 power plants in Bosnia and Herzegovina — 0.1% of the world's mapped total, the 64th-largest national fleet of the 155 countries with any.
What is the largest power plant in Bosnia and Herzegovina?
Ugljevik power station, at 700 MW.
How much power-generation capacity do Bosnia and Herzegovina's power plants have?
About 3.9 GW operating across 14 plants, with a further 5.6 GW under construction or proposed. That covers utility-scale sites of 100 MW and above, so it sits below national installed capacity wherever distributed generation is large.
Who owns the power plants in Bosnia and Herzegovina?
Elektroprivreda Republike Srpske (ERS) is named as owner or operator on the most — 6 of 42 (14%). Next are Pension Reserve Fund of the Republic of Srpska (5), Republic of Srpska Restitution Fund (5) and WPD AG (5).
How old are Bosnia and Herzegovina's power plants?
The median commissioning year is 1981, across the 14 in service with a known start date. The oldest still listed is Jablanica hydroelectric plant (1955); 1 came online in the past ten years.
What new power plants are being built in Bosnia and Herzegovina?
27 projects are under construction or proposed. The largest are Ugljevik power station (700 MW), Nevesinje solar farm (500 MW) and Kruzi wind farm (405 MW).

Other asset classes in Bosnia and Herzegovina

Power Plants in other countries