Serbia · asset class

Power Plants in Serbia

Serbia has 49 power plants mapped on the OverWatts open energy atlas — the 60th-largest fleet of the 155 countries that hold any, and 0.2% of the world's mapped total. Of these, 14 operating and 35 under construction or proposed. Operating generation capacity totals 7.0 GW across 14 utility-scale plants of 100 MW and above. The largest is Nikola Tesla power station (3.1 GW).

The largest owner-operators are Elektroprivreda Srbije (EPS) (8), Elektroprivreda Srbije Beograd AD (5) and CWP Global (4) — Elektroprivreda Srbije (EPS) alone is named on 16% of them. Half of Serbia's power plants in service predate 1982 (median commissioning year of the 14 with a known date), 4 came online in the past decade and the oldest still listed is Zvornik hydroelectric plant, dating from 1955. 35 are in the pipeline, led by Djerdap III hydroelectric plant (2.4 GW), under construction. They account for 53% of every energy asset OverWatts maps in Serbia.

49
Power Plant in Serbia
#60
of 155 countries
7.0 GW
Operating capacity
35
In construction / proposed

Operating generation capacity by fuel

On the interactive map

Open the interactive map →

Largest power plants in Serbia

Who owns Serbia's power plants

Counts an asset once per company named as its owner or operator; a joint venture counts for each partner.

When they were built

Median commissioning year 1982 · oldest Zvornik hydroelectric plant (1955) · newest Krivača wind farm (2024) · 14 of 49 carry a start date

Under construction & proposed

How Serbia compares · power plants by country

Frequently asked

How many power plants are there in Serbia?
OverWatts maps 49 power plants in Serbia — 0.2% of the world's mapped total, the 60th-largest national fleet of the 155 countries with any.
What is the largest power plant in Serbia?
Nikola Tesla power station, at 3.1 GW.
How much power-generation capacity do Serbia's power plants have?
About 7.0 GW operating across 14 plants, with a further 13.7 GW under construction or proposed. That covers utility-scale sites of 100 MW and above, so it sits below national installed capacity wherever distributed generation is large.
Who owns the power plants in Serbia?
Elektroprivreda Srbije (EPS) is named as owner or operator on the most — 8 of 49 (16%). Next are Elektroprivreda Srbije Beograd AD (5), CWP Global (4) and Fortis Inc (4).
How old are Serbia's power plants?
The median commissioning year is 1982, across the 14 in service with a known start date. The oldest still listed is Zvornik hydroelectric plant (1955); 4 came online in the past ten years.
What new power plants are being built in Serbia?
35 projects are under construction or proposed. The largest are Djerdap III hydroelectric plant (2.4 GW), Bor wind farm (1.5 GW) and Stiško Polje wind farm (1.0 GW).

Other asset classes in Serbia