Browse the atlas
Asset classes
- Transmission Line80,968
- Power Plant32,429
- Substation / Converter7,614
- Oil & Gas Field7,055
- Coal / Uranium Mine5,382
- Pipeline4,951
- Cement Plant3,513
- Data Centre3,283
- Iron & Steel Plant1,293
- LNG Terminal1,198
- Grid Storage965
- Iron Ore Mine949
- Chemical Plant868
- Interconnector704
- Export Terminal519
- Refinery279
- Storage / Tank Farm38
- Oil / Commodity Contract19
- Hydrogen Project18
- Carbon Capture (CCS)16
Chokepoints
Bosnia and Herzegovina — Energy Infrastructure
OverWatts maps 72 energy assets in Bosnia and Herzegovina across 8 layers — the 75th-largest mapped base of 157 countries. They include 42 power plants, 15 coal / uranium mines and 7 interconnectors. Operating generation capacity is 3.9 GW, led by coal at 51%.
The companies named on the most assets are Elektroprivreda BiH dd (11), Elektroprivreda Republike Srpske (ERS) (6) and Pension Reserve Fund of the Republic of Srpska (5), counting both ownership and operatorship. Half of Bosnia and Herzegovina's mapped assets in service predate 1977 (median commissioning year of the 29 with a known date), 2 came online in the past decade and the oldest still listed is Haljinici Underground Coal Mine, dating from 1902. 34 projects are under construction or proposed, led by Bosnia and Herzegovina – Serbia interconnection (planned) (2.3 GW).
Operating generation capacity by fuel
Utility-scale sites of 100 MW and above. Distributed generation — rooftop solar especially — is outside the tracker, so this runs below national installed capacity.
- coal2.0 GW +1.1 GW planned
- hydro1.9 GW +274 MW planned
- wind0 MW +2.1 GW planned
- solar0 MW +1.9 GW planned
- gas0 MW +175 MW planned
Electricity generated by fuel · 2025
What the fleet actually produced — distinct from the installed capacity above.
- coal8.1 TWh 55%
- hydro5.3 TWh 36%
- solar600 GWh 4%
- wind400 GWh 3%
- oil200 GWh 1%
Ember · source · CC-BY-4.0
On the interactive map
Browse by asset class
Under construction & proposed
- Bosnia and Herzegovina – Serbia interconnection (planned)Interconnectors · 2.3 GW · 2045
- Bosnia and Herzegovina – Serbia interconnection (planned)Interconnectors · 850 MW · 2030
- Ugljevik power stationPower Plants · 700 MW · coal
- Bosnia and Herzegovina – Croatia interconnection (planned)Interconnectors · 644 MW · 2040
- Bosnia and Herzegovina – Serbia interconnection (planned)Interconnectors · 500 MW · 2040
- Nevesinje solar farmPower Plants · 500 MW · solar
- Kruzi wind farmPower Plants · 405 MW · wind
- Vaganj wind farmPower Plants · 405 MW · wind
- Gacko Thermal Power PlantPower Plants · 350 MW · coal
- Bileća solar farmPower Plants · 270 MW · solar
- VE Kacelj wind farmPower Plants · 200 MW · wind
- VP Energokul wind farmPower Plants · 200 MW · wind · 2027
- Kakanj Thermal Power PlantPower Plants · 175 MW · gas
- Stolac solar farmPower Plants · 175 MW · solar · 2026
- Dabar hydroelectric plantPower Plants · 159 MW · hydro · 2027
- EPHZHB 1 solar farmPower Plants · 150 MW · solar · 2027
- SPP Lena solar farmPower Plants · 150 MW · solar
- Čadilj wind farmPower Plants · 138 MW · wind
- Slovinj wind farmPower Plants · 138 MW · wind
- Poklečani wind farmPower Plants · 132 MW · wind · 2027
- Trebinje solar farmPower Plants · 126 MW · solar
- Marino Brdo wind farmPower Plants · 126 MW · wind
- Livno wind farmPower Plants · 125 MW · wind · 2027
- Siroka Draga wind farmPower Plants · 125 MW · wind · 2026
- Buk Bijela hydroelectric plantPower Plants · 115 MW · hydro
- Skadimovac wind farmPower Plants · 110 MW · wind
- Bančići solar farmPower Plants · 103 MW · solar
- Orlovac solar farmPower Plants · 102 MW · solar · 2026
- Bjelosavljevići solar farmPower Plants · 100 MW · solar
- Kamengrad solar farmPower Plants · 100 MW · solar
- Seline solar farmPower Plants · 100 MW · solar · 2027
- Stanari Coal MineCoal & Uranium Mines · 2028
- Delići, Peljave-Tobut, and Baljak Coal MinesCoal & Uranium Mines
- Serbia–Bosnia Interconnector Gas Pipeline — Bijeljina–Banja Luka–Novi GradPipelines · 2026
Largest assets
- Bosnia and Herzegovina – Serbia interconnection (planned)Interconnectors · 2.3 GW · 2045
- Bosnia and Herzegovina – Serbia interconnection (planned)Interconnectors · 850 MW · 2030
- Bosnia and Herzegovina – Montenegro interconnectionInterconnectors · 800 MW
- Bosnia and Herzegovina – Croatia interconnectionInterconnectors · 750 MW
- Ugljevik power stationPower Plants · 700 MW · coal
- Bosnia and Herzegovina – Croatia interconnection (planned)Interconnectors · 644 MW · 2040
- Tuzla Thermal Power PlantPower Plants · 640 MW · coal · 1971
- Bosnia and Herzegovina – Serbia interconnectionInterconnectors · 530 MW
- Bosnia and Herzegovina – Serbia interconnection (planned)Interconnectors · 500 MW · 2040
- Nevesinje solar farmPower Plants · 500 MW · solar
- Kakanj Thermal Power PlantPower Plants · 450 MW · coal · 1969
- Čapljina hydroelectric plantPower Plants · 440 MW · hydro · 1979
- Čapljina hydroelectric plantGrid Storage · 440 MW · 1979
- Kruzi wind farmPower Plants · 405 MW · wind
- Vaganj wind farmPower Plants · 405 MW · wind
- Gacko Thermal Power PlantPower Plants · 350 MW · coal
- Višegrad hydroelectric plantPower Plants · 315 MW · hydro · 1989
- Gacko Thermal Power PlantPower Plants · 300 MW · coal · 1983
- Stanari Thermal Power PlantPower Plants · 300 MW · coal · 2016
- Ugljevik power stationPower Plants · 300 MW · coal · 1985
- Bileća solar farmPower Plants · 270 MW · solar
- Dubrovnik hydroelectric plantPower Plants · 252 MW · hydro · 1965
- Salakovac hydroelectric plantPower Plants · 210 MW · hydro · 1981
- VE Kacelj wind farmPower Plants · 200 MW · wind
- VP Energokul wind farmPower Plants · 200 MW · wind · 2027
Biggest owners & operators
- Elektroprivreda BiH dd11 15%
- Elektroprivreda Republike Srpske (ERS)6 8%
- Pension Reserve Fund of the Republic of Srpska5 7%
- Republic of Srpska Restitution Fund5 7%
- WPD AG5 7%
- Elektroprivreda HZHB Mostar dd4 6%
- Kristal Invest4 6%
- EFT Rudnik i Termoelektrana Stanari doo3 4%
Counts an asset once per company named as its owner or operator; a joint venture counts for each partner.
Frequently asked
- How many energy assets does Bosnia and Herzegovina have?
- OverWatts maps 72 in Bosnia and Herzegovina across 8 asset classes — the 75th-largest mapped base of the 157 countries covered.
- How much electricity generation capacity does Bosnia and Herzegovina have?
- About 3.9 GW operating across 14 plants, mostly coal 51% and hydro 49%.
- Who owns Bosnia and Herzegovina's energy infrastructure?
- Elektroprivreda BiH dd is named as owner or operator on the most mapped assets (11), followed by Elektroprivreda Republike Srpske (ERS) (6), Pension Reserve Fund of the Republic of Srpska (5) and Republic of Srpska Restitution Fund (5).
- What energy projects are under construction in Bosnia and Herzegovina?
- The largest under way or proposed are Bosnia and Herzegovina – Serbia interconnection (planned) (2.3 GW), Ugljevik power station (700 MW) and Bosnia and Herzegovina – Croatia interconnection (planned) (644 MW).