Browse the atlas
Asset classes
- Transmission Line80,968
- Power Plant32,429
- Substation / Converter7,614
- Oil & Gas Field7,055
- Coal / Uranium Mine5,382
- Pipeline4,951
- Cement Plant3,513
- Data Centre3,283
- Iron & Steel Plant1,293
- LNG Terminal1,198
- Grid Storage965
- Iron Ore Mine949
- Chemical Plant868
- Interconnector704
- Export Terminal519
- Refinery279
- Storage / Tank Farm38
- Oil / Commodity Contract19
- Hydrogen Project18
- Carbon Capture (CCS)16
Chokepoints
Austria · asset class
Power Plants in Austria
Austria has 66 power plants mapped on the OverWatts open energy atlas — the 51st-largest fleet of the 155 countries that hold any, and 0.2% of the world's mapped total. Of these, 51 operating and 7 under construction or proposed. Operating generation capacity totals 15.1 GW across 51 utility-scale plants of 100 MW and above. The largest is Simmering power station (1.3 GW).
The largest owner-operators are Verbund Hydro Power GmbH (23), Illwerke vkw (8) and Tiroler Wasserkraft AG (TIWAG) (6) — Verbund Hydro Power GmbH alone is named on 35% of them. Half of Austria's power plants in service predate 1979 (median commissioning year of the 51 with a known date), 4 came online in the past decade and the oldest still listed is Vermunt hydroelectric plant, dating from 1930. 7 are in the pipeline, led by Lunersee II hydroelectric plant (1.0 GW), under construction. They account for 47% of every energy asset OverWatts maps in Austria.
Operating generation capacity by fuel
- hydro10.2 GW +2.6 GW planned
- gas4.3 GW +398 MW planned
- wind271 MW +102 MW planned
- oil170 MW
- solar164 MW
- coal0 MW +1.9 GW planned
On the interactive map
Largest power plants in Austria
- Simmering power station1.3 GW · gas · 2006
- Mellach power station1.1 GW · gas · 2012
- Lunersee II hydroelectric plant1.0 GW · hydro · 2036 · construction
- Duernrohr power station802 MW · coal · 1985 · idle
- Malta Hauptstufe hydroelectric plant730 MW · hydro · 1979
- Kops II hydroelectric plant525 MW · hydro · 2008
- Prutz 2 hydroelectric plant500 MW · hydro · 2034 · construction
- Silz hydroelectric plant500 MW · hydro · 1981
- Theiss power station485 MW · gas · 2003
- Kaprun Limberg II hydroelectric plant480 MW · hydro · 2011
- Kaprun Limberg III hydroelectric plant480 MW · hydro · 2025
- Reissek II hydroelectric plant430 MW · hydro · 2016
- Timelkam power station405 MW · gas · 2008
- Versetz hydroelectric plant400 MW · hydro · 2034 · construction
- Donaustadt power station395 MW · gas · 2001
- Prutz hydroelectric plant392 MW · hydro · 1964
- Obervermunt II hydroelectric plant380 MW · hydro · 2019
- Häusling hydroelectric plant360 MW · hydro · 1988
- Mayrhofen hydroelectric plant355 MW · hydro · 1970
- Voitsberg power station330 MW · coal · 1983 · idle
- Altenwörth hydroelectric plant328 MW · hydro · 1976
- Pfaffenboden hydroelectric plant300 MW · hydro · construction
- Rodund II hydroelectric plant295 MW · hydro · 1976
- Greifenstein hydroelectric plant293 MW · hydro · 1985
- Kühtai hydroelectric plant289 MW · hydro · 1981
- Kops I hydroelectric plant288 MW · hydro · 1969
- Aschach hydroelectric plant287 MW · hydro · 1964
- Lunersee hydroelectric plant280 MW · hydro · 1958
- Kaprun Haupstufe hydroelectric plant260 MW · hydro · 1953
- Kaprun Oberstufe hydroelectric plant260 MW · hydro · 1956
- Mellach power station246 MW · coal · 1986 · idle
- Theiss power station240 MW · gas · 2020 · idle
- Ybbs-Persenbeug hydroelectric plant237 MW · hydro · 1959
- Rosshag hydroelectric plant231 MW · hydro · 1972
- Riedersbach power station220 MW · coal · 1969 · idle
- Linz Mitte power station217 MW · gas · 2004
- Wallsee-Mitterkirchen hydroelectric plant210 MW · hydro · 1968
- Gerlos hydroelectric plant200 MW · hydro · 1949
- Rodund I hydroelectric plant198 MW · hydro · 1943
- St Andrae power station192 MW · coal · 1996 · idle
- Kühtai 2 hydroelectric plant190 MW · hydro · 2026 · construction
- Melk hydroelectric plant187 MW · hydro · 1982
- Ottensheim-Wilhering hydroelectric plant179 MW · hydro · 1974
- Linz Süd power station172 MW · gas · 2000
- Freudenau hydroelectric plant172 MW · hydro · 1999
- Schwechat Refinery power station170 MW · oil · 1975
- Tauernmoos hydroelectric plant170 MW · hydro · 2026 · construction
- Abwinden-Asten hydroelectric plant168 MW · hydro · 1979
- Wallern-Tadten solar farm164 MW · solar · 2024
- Korneuberg power station158 MW · gas · 1983 · idle
- Gols wind farm157 MW · wind · 2003
- Vermunt hydroelectric plant157 MW · hydro · 1930
- Werk Linz power station153 MW · gas · 1995
- Leopoldau power station140 MW · gas · 1975
- Feldsee hydroelectric plant140 MW · hydro · 2009
- Zeltweg power station137 MW · coal · 1962 · idle
- Jochenstein hydroelectric plant132 MW · hydro · 1956
- Kaprun Schwarzach hydroelectric plant120 MW · hydro · 1960
- Malta Oberstufe hydroelectric plant120 MW · hydro · 1979
- Andau wind farm114 MW · wind · 2013
- Innerfragant Oschenik hydroelectric plant114 MW · hydro · 1965
- Hintermuhr hydroelectric plant107 MW · hydro · 1991
- Freilaenderalm wind farm102 MW · wind · 2026 · construction
- Ausserfragant hydroelectric plant100 MW · hydro · 1965
- Braunau-Simbach hydroelectric plant100 MW · hydro · 1954
- Schärding Neuhaus hydroelectric plant100 MW · hydro · 1966
Who owns Austria's power plants
- Verbund Hydro Power GmbH23 35%
- Illwerke vkw8 12%
- Tiroler Wasserkraft AG (TIWAG)6 9%
- Verbund AG4 6%
- Wien Energie GmbH4 6%
- Energie Burgenland3 5%
- Grenzkraftwerke GMBH (GKW)3 5%
- KELAG3 5%
Counts an asset once per company named as its owner or operator; a joint venture counts for each partner.
When they were built
- 1930s1
- 1940s2
- 1950s6
- 1960s8
- 1970s10
- 1980s5
- 1990s3
- 2000s9
- 2010s5
- 2020s2
Median commissioning year 1979 · oldest Vermunt hydroelectric plant (1930) · newest Kaprun Limberg III hydroelectric plant (2025) · 51 of 66 carry a start date
Under construction & proposed
- Lunersee II hydroelectric plant1.0 GW · hydro · 2036 · construction
- Prutz 2 hydroelectric plant500 MW · hydro · 2034 · construction
- Versetz hydroelectric plant400 MW · hydro · 2034 · construction
- Pfaffenboden hydroelectric plant300 MW · hydro · construction
- Kühtai 2 hydroelectric plant190 MW · hydro · 2026 · construction
- Tauernmoos hydroelectric plant170 MW · hydro · 2026 · construction
- Freilaenderalm wind farm102 MW · wind · 2026 · construction
How Austria compares · power plants by country
- 1. China11,537
- 48. Ukraine78
- 49. Nepal72
- 50. Algeria69
- 51. Austria66
- 52. Laos66
- 53. United Arab Emirates62
- 54. Myanmar60
Frequently asked
- How many power plants are there in Austria?
- OverWatts maps 66 power plants in Austria — 0.2% of the world's mapped total, the 51st-largest national fleet of the 155 countries with any.
- What is the largest power plant in Austria?
- Simmering power station, at 1.3 GW.
- How much power-generation capacity do Austria's power plants have?
- About 15.1 GW operating across 51 plants, with a further 5.0 GW under construction or proposed. That covers utility-scale sites of 100 MW and above, so it sits below national installed capacity wherever distributed generation is large.
- Who owns the power plants in Austria?
- Verbund Hydro Power GmbH is named as owner or operator on the most — 23 of 66 (35%). Next are Illwerke vkw (8), Tiroler Wasserkraft AG (TIWAG) (6) and Verbund AG (4).
- How old are Austria's power plants?
- The median commissioning year is 1979, across the 51 in service with a known start date. The oldest still listed is Vermunt hydroelectric plant (1930); 4 came online in the past ten years.
- What new power plants are being built in Austria?
- 7 projects are under construction or proposed. The largest are Lunersee II hydroelectric plant (1.0 GW), Prutz 2 hydroelectric plant (500 MW) and Versetz hydroelectric plant (400 MW).