Browse the atlas
Asset classes
- Transmission Line80,968
- Power Plant32,429
- Substation / Converter7,614
- Oil & Gas Field7,055
- Coal / Uranium Mine5,382
- Pipeline4,951
- Cement Plant3,513
- Data Centre3,283
- Iron & Steel Plant1,293
- LNG Terminal1,198
- Grid Storage965
- Iron Ore Mine949
- Chemical Plant868
- Interconnector704
- Export Terminal519
- Refinery279
- Storage / Tank Farm38
- Oil / Commodity Contract19
- Hydrogen Project18
- Carbon Capture (CCS)16
Chokepoints
Latvia · asset class
Power Plants in Latvia
Latvia has 27 power plants mapped on the OverWatts open energy atlas — the 79th-largest fleet of the 155 countries that hold any, and under 0.1% of the world's mapped total. Of these, 6 operating and 21 under construction or proposed. Operating generation capacity totals 2.7 GW across 6 utility-scale plants of 100 MW and above. The largest is Elwind wind farm (Latvia) (1.0 GW).
The largest owner-operators are Latvenergo AS (6), Vindr Latvia SIA (5) and European Energy A/S (2) — Latvenergo AS alone is named on 22% of them. Half of Latvia's power plants in service predate 2005 (median commissioning year of the 6 with a known date), 1 came online in the past decade and the oldest still listed is Kegums hydroelectric plant, dating from 1940. 21 are in the pipeline, led by Elwind wind farm (Latvia) (1.0 GW), proposed. They account for 63% of every energy asset OverWatts maps in Latvia.
Operating generation capacity by fuel
- hydro1.5 GW
- gas1.0 GW
- solar145 MW +1.8 GW planned
- wind0 MW +3.4 GW planned
On the interactive map
Largest power plants in Latvia
- Elwind wind farm (Latvia)1.0 GW · wind · 2030 · proposed
- Plavinas hydroelectric plant894 MW · hydro · 1965
- Riga-2 power station881 MW · gas · 2009
- Valmiera-Valka wind farm480 MW · wind · proposed
- Nīcgale wind farm425 MW · wind · proposed
- Riga hydroelectric plant402 MW · hydro · 1974
- Balvi solar farm400 MW · solar · proposed
- Lazas solar farm400 MW · solar · proposed
- Amata un Bērzkrogs wind farm344 MW · wind · construction
- Aizpute solar farm265 MW · solar · proposed
- Kegums hydroelectric plant240 MW · hydro · 1940
- Latgola wind farm210 MW · wind · construction
- Kūkas wind farm184 MW · wind · proposed
- Tume solar farm174 MW · solar · proposed
- Riga-1 power station158 MW · gas · 2005
- Pienava wind farm158 MW · wind · 2027 · construction
- Apriķi wind farm150 MW · wind · construction
- Tārgale solar farm148 MW · solar · 2026 · construction
- Stelpe solar farm145 MW · solar · 2025
- Sējas wind farm136 MW · wind · construction
- Ošenieki wind farm130 MW · wind · proposed
- Brocēni solar farm115 MW · solar · 2026 · proposed
- Smikši wind farm112 MW · wind · construction
- Zirņu solar farm104 MW · solar · proposed
- Līvāni wind farm104 MW · wind · proposed
- Jekabpils solar farm100 MW · solar · construction
- Port of Riga solar farm100 MW · solar · proposed
Who owns Latvia's power plants
- Latvenergo AS6 22%
- Vindr Latvia SIA5 19%
- European Energy A/S2 7%
- Apriķu vējš SIA1 4%
- Eolus Vind AB1 4%
- EWE Neue Energien 2 SIA1 4%
- EWE Neue Energien 5 SIA1 4%
- Green Genius1 4%
Counts an asset once per company named as its owner or operator; a joint venture counts for each partner.
When they were built
- 1940s1
- 1960s1
- 1970s1
- 2000s2
- 2020s1
Median commissioning year 2005 · oldest Kegums hydroelectric plant (1940) · newest Stelpe solar farm (2025) · 6 of 27 carry a start date
Under construction & proposed
- Elwind wind farm (Latvia)1.0 GW · wind · 2030 · proposed
- Valmiera-Valka wind farm480 MW · wind · proposed
- Nīcgale wind farm425 MW · wind · proposed
- Balvi solar farm400 MW · solar · proposed
- Lazas solar farm400 MW · solar · proposed
- Amata un Bērzkrogs wind farm344 MW · wind · construction
- Aizpute solar farm265 MW · solar · proposed
- Latgola wind farm210 MW · wind · construction
- Kūkas wind farm184 MW · wind · proposed
- Tume solar farm174 MW · solar · proposed
- Pienava wind farm158 MW · wind · 2027 · construction
- Apriķi wind farm150 MW · wind · construction
How Latvia compares · power plants by country
- 1. China11,537
- 77. Kenya30
- 78. Sri Lanka30
- 79. Azerbaijan27
- 80. Latvia27
- 81. Panama27
- 82. Cambodia25
- 83. Mozambique25
Frequently asked
- How many power plants are there in Latvia?
- OverWatts maps 27 power plants in Latvia — under 0.1% of the world's mapped total, the 79th-largest national fleet of the 155 countries with any.
- What is the largest power plant in Latvia?
- Elwind wind farm (Latvia), at 1.0 GW.
- How much power-generation capacity do Latvia's power plants have?
- About 2.7 GW operating across 6 plants, with a further 5.2 GW under construction or proposed. That covers utility-scale sites of 100 MW and above, so it sits below national installed capacity wherever distributed generation is large.
- Who owns the power plants in Latvia?
- Latvenergo AS is named as owner or operator on the most — 6 of 27 (22%). Next are Vindr Latvia SIA (5), European Energy A/S (2) and Apriķu vējš SIA (1).
- How old are Latvia's power plants?
- The median commissioning year is 2005, across the 6 in service with a known start date. The oldest still listed is Kegums hydroelectric plant (1940); 1 came online in the past ten years.
- What new power plants are being built in Latvia?
- 21 projects are under construction or proposed. The largest are Elwind wind farm (Latvia) (1.0 GW), Valmiera-Valka wind farm (480 MW) and Nīcgale wind farm (425 MW).