Power Plant

Pienava wind farm

Latvia

16th-largest power plant in Latvia of 27 · top 66% worldwide (#19,554 of 29,849)

Owner
Eolus Vind AB
Status
construction
Capacity
158 MW
Fuel
wind
Commissioned
2027

Comparable power plants · Latvia · 27 ranked

All power plants in Latvia

Grid connection · within 50 km

Nearest substation
Tume
Its voltage
330 kV
Distance
24 km
Strongest line nearby
3 kV HVDC
Substations in range
3

Mapped grid infrastructure from OpenStreetMap, whose coverage is excellent in some regions and sparse in others. Nothing shown here means nothing is mappednearby — not that the site is unconnected. Lines are matched on a segment’s midpoint, so a corridor passing directly overhead can be missed; this under-reports rather than invents.

Co-located infrastructure · within 25 km

On the interactive map

Open the interactive map →

Portfolio

SOURCE: Global Energy Monitor · Global Integrated Power (CC BY 4.0)