Cuba · asset class

Power Plants in Cuba

Cuba has 19 power plants mapped on the OverWatts open energy atlas — the 93rd-largest fleet of the 155 countries that hold any, and under 0.1% of the world's mapped total. Of these, 5 operating and 4 under construction or proposed. Operating generation capacity totals 1.0 GW across 5 utility-scale plants of 100 MW and above. The largest is Program-06 ISA solar farm (785 MW).

The largest owner-operators are Unión Eléctrica de Cuba (14), Energas SA (2) and Baranca Stream (1) — Unión Eléctrica de Cuba alone is named on 74% of them. Half of Cuba's power plants in service predate 2003 (median commissioning year of the 5 with a known date) and the oldest still listed is CT 10 de Octubre power station, dating from 1969. 4 are in the pipeline, led by Program-06 ISA solar farm (785 MW), proposed. They account for 53% of every energy asset OverWatts maps in Cuba.

19
Power Plant in Cuba
#93
of 155 countries
1.0 GW
Operating capacity
4
In construction / proposed

Operating generation capacity by fuel

On the interactive map

Open the interactive map →

Largest power plants in Cuba

Who owns Cuba's power plants

Counts an asset once per company named as its owner or operator; a joint venture counts for each partner.

When they were built

Median commissioning year 2003 · oldest CT 10 de Octubre power station (1969) · newest Boca de Jaruco power station (2015) · 5 of 19 carry a start date

Under construction & proposed

How Cuba compares · power plants by country

Frequently asked

How many power plants are there in Cuba?
OverWatts maps 19 power plants in Cuba — under 0.1% of the world's mapped total, the 93rd-largest national fleet of the 155 countries with any.
What is the largest power plant in Cuba?
Program-06 ISA solar farm, at 785 MW.
How much power-generation capacity do Cuba's power plants have?
About 1.0 GW operating across 5 plants, with a further 3.9 GW under construction or proposed. That covers utility-scale sites of 100 MW and above, so it sits below national installed capacity wherever distributed generation is large.
Who owns the power plants in Cuba?
Unión Eléctrica de Cuba is named as owner or operator on the most — 14 of 19 (74%). Next are Energas SA (2), Baranca Stream (1) and Karpowership (1).
How old are Cuba's power plants?
The median commissioning year is 2003, across the 5 in service with a known start date. The oldest still listed is CT 10 de Octubre power station (1969).
What new power plants are being built in Cuba?
4 projects are under construction or proposed. The largest are Program-06 ISA solar farm (785 MW), Termoeléctrica de Santa Cruz power station (200 MW) and TBD Guajaibón solar farm (127 MW).

Other asset classes in Cuba

Power Plants in other countries