Cuba — Energy Infrastructure

OverWatts maps 36 energy assets in Cuba across 4 layers — the 102nd-largest mapped base of 157 countries. They include 19 power plants, 8 oil & gas fields and 7 cement plants. Operating generation capacity is 1.0 GW, led by oil at 53%.

The companies named on the most assets are Unión Eléctrica de Cuba (14), Corporación de Cementos Cubanos (4) and CUPET (4), counting both ownership and operatorship. Half of Cuba's mapped assets in service predate 1996 (median commissioning year of the 15 with a known date) and the oldest still listed is Mariel Cement Plant, dating from 1918. 8 projects are under construction or proposed, led by Program-06 ISA solar farm (785 MW).

36
Total assets
#102
of 157 countries
1.0 GW
operating · 19 power plants
8
In construction / proposed

Operating generation capacity by fuel

Utility-scale sites of 100 MW and above. Distributed generation — rooftop solar especially — is outside the tracker, so this runs below national installed capacity.

Electricity generated by fuel · 2024

What the fleet actually produced — distinct from the installed capacity above.

Total 19.4 TWhDemand 19.4 TWhClean 4%Intensity 643 gCO₂/kWh

Ember · source · CC-BY-4.0

On the interactive map

Open the interactive map →

Browse by asset class

Under construction & proposed

Largest assets

Biggest owners & operators

Counts an asset once per company named as its owner or operator; a joint venture counts for each partner.

Frequently asked

How many energy assets does Cuba have?
OverWatts maps 36 in Cuba across 4 asset classes — the 102nd-largest mapped base of the 157 countries covered.
How much electricity generation capacity does Cuba have?
About 1.0 GW operating across 5 plants, mostly oil 53% and gas 47%.
Who owns Cuba's energy infrastructure?
Unión Eléctrica de Cuba is named as owner or operator on the most mapped assets (14), followed by Corporación de Cementos Cubanos (4), CUPET (4) and Melbana Energy (3).
What energy projects are under construction in Cuba?
The largest under way or proposed are Program-06 ISA solar farm (785 MW), Termoeléctrica de Santa Cruz power station (200 MW) and TBD Guajaibón solar farm (127 MW).