Browse the atlas
Asset classes
- Transmission Line80,968
- Power Plant32,429
- Substation / Converter7,614
- Oil & Gas Field7,055
- Coal / Uranium Mine5,382
- Pipeline4,951
- Cement Plant3,513
- Data Centre3,283
- Iron & Steel Plant1,293
- LNG Terminal1,198
- Grid Storage965
- Iron Ore Mine949
- Chemical Plant868
- Interconnector704
- Export Terminal519
- Refinery279
- Storage / Tank Farm38
- Oil / Commodity Contract19
- Hydrogen Project18
- Carbon Capture (CCS)16
Chokepoints
Tajikistan · asset class
Power Plants in Tajikistan
Tajikistan has 19 power plants mapped on the OverWatts open energy atlas — the 93rd-largest fleet of the 155 countries that hold any, and under 0.1% of the world's mapped total. Of these, 9 operating and 10 under construction or proposed. Operating generation capacity totals 6.3 GW across 9 utility-scale plants of 100 MW and above. The largest is Nurek hydroelectric plant (2.7 GW).
The largest owner-operators are OSHC "Barki Tojik" (11), State Committee on Investment and State Property Management (SCI) of the Republic of Tajikistan (2) and Barqi Tojik OJSC (1) — OSHC "Barki Tojik" alone is named on 58% of them. Half of Tajikistan's power plants in service predate 1985 (median commissioning year of the 9 with a known date), 1 came online in the past decade and the oldest still listed is Kairakkum hydroelectric plant, dating from 1956. 10 are in the pipeline, led by Rogun hydroelectric plant (2.4 GW), under construction. They account for 51% of every energy asset OverWatts maps in Tajikistan.
Operating generation capacity by fuel
- hydro5.8 GW +4.1 GW planned
- coal400 MW
- gas120 MW
- solar0 MW +900 MW planned
On the interactive map
Largest power plants in Tajikistan
- Nurek hydroelectric plant2.7 GW · hydro · 1972
- Rogun hydroelectric plant2.4 GW · hydro · 2026 · construction
- Rogun hydroelectric plant1.2 GW · hydro · 2018
- Shurob hydroelectric plant850 MW · hydro · proposed
- Sangtuda-1 hydroelectric plant670 MW · hydro · 2008
- Baipaza hydroelectric plant600 MW · hydro · 1985
- Sughd (China Datang) solar farm500 MW · solar · proposed
- Dushanbe-2 power station400 MW · coal · 2014
- Sarband hydroelectric plant240 MW · hydro · 1962
- Sangtuda-2 hydroelectric plant220 MW · hydro · 2011
- Panj solar farm200 MW · solar · proposed
- Sughd Region solar farm200 MW · solar · proposed
- Nurobod-1 hydroelectric plant200 MW · hydro · proposed
- Sanobod hydroelectric plant200 MW · hydro · construction
- Kairakkum hydroelectric plant174 MW · hydro · 1956
- Nurobod-2 hydroelectric plant160 MW · hydro · proposed
- Yovon hydroelectric plant160 MW · hydro · construction
- Fandaryo hydroelectric plant135 MW · hydro · 2029 · construction
- Yavan power station120 MW · gas · 1968
Who owns Tajikistan's power plants
- OSHC "Barki Tojik"11 58%
- State Committee on Investment and State Property Management (SCI) of the Republic of Tajikistan2 11%
- Barqi Tojik OJSC1 5%
- China Datang Corp Ltd1 5%
- Eging PV Technology Co Ltd1 5%
- Inter RAO PJSC1 5%
- Rosatom State Nuclear Energy CORP (ROSATOM)1 5%
- Sangob OSHC "Barki Tojik"1 5%
Counts an asset once per company named as its owner or operator; a joint venture counts for each partner.
When they were built
- 1950s1
- 1960s2
- 1970s1
- 1980s1
- 2000s1
- 2010s3
Median commissioning year 1985 · oldest Kairakkum hydroelectric plant (1956) · newest Rogun hydroelectric plant (2018) · 9 of 19 carry a start date
Under construction & proposed
- Rogun hydroelectric plant2.4 GW · hydro · 2026 · construction
- Shurob hydroelectric plant850 MW · hydro · proposed
- Sughd (China Datang) solar farm500 MW · solar · proposed
- Panj solar farm200 MW · solar · proposed
- Sughd Region solar farm200 MW · solar · proposed
- Nurobod-1 hydroelectric plant200 MW · hydro · proposed
- Sanobod hydroelectric plant200 MW · hydro · construction
- Nurobod-2 hydroelectric plant160 MW · hydro · proposed
- Yovon hydroelectric plant160 MW · hydro · construction
- Fandaryo hydroelectric plant135 MW · hydro · 2029 · construction
How Tajikistan compares · power plants by country
- 1. China11,537
- 93. Cuba19
- 94. Jordan19
- 95. Singapore19
- 96. Tajikistan19
- 97. Uruguay19
- 98. Montenegro18
- 99. Mongolia18
Frequently asked
- How many power plants are there in Tajikistan?
- OverWatts maps 19 power plants in Tajikistan — under 0.1% of the world's mapped total, the 93rd-largest national fleet of the 155 countries with any.
- What is the largest power plant in Tajikistan?
- Nurek hydroelectric plant, at 2.7 GW.
- How much power-generation capacity do Tajikistan's power plants have?
- About 6.3 GW operating across 9 plants, with a further 5.0 GW under construction or proposed. That covers utility-scale sites of 100 MW and above, so it sits below national installed capacity wherever distributed generation is large.
- Who owns the power plants in Tajikistan?
- OSHC "Barki Tojik" is named as owner or operator on the most — 11 of 19 (58%). Next are State Committee on Investment and State Property Management (SCI) of the Republic of Tajikistan (2), Barqi Tojik OJSC (1) and China Datang Corp Ltd (1).
- How old are Tajikistan's power plants?
- The median commissioning year is 1985, across the 9 in service with a known start date. The oldest still listed is Kairakkum hydroelectric plant (1956); 1 came online in the past ten years.
- What new power plants are being built in Tajikistan?
- 10 projects are under construction or proposed. The largest are Rogun hydroelectric plant (2.4 GW), Shurob hydroelectric plant (850 MW) and Sughd (China Datang) solar farm (500 MW).