Browse the atlas
OverWatts AtlasCountriesOwnersInsightsWireChangesSources Live map
Asset classes
- Transmission Line80,968
- Power Plant32,429
- Substation / Converter7,614
- Oil & Gas Field7,055
- Coal / Uranium Mine5,382
- Pipeline4,951
- Cement Plant3,513
- Data Centre3,283
- Iron & Steel Plant1,293
- LNG Terminal1,198
- Grid Storage965
- Iron Ore Mine949
- Chemical Plant868
- Interconnector704
- Export Terminal519
- Refinery279
- Storage / Tank Farm38
- Oil / Commodity Contract19
- Hydrogen Project18
- Carbon Capture (CCS)16
Chokepoints
Power Plant
Alcalá De Guadaira Solar Park
427th-largest power plant in Spain of 653 · top 71% worldwide (#21,157 of 29,849)
- Operator
- Amazon
- Parent company
- Amazon
- Owner
- Amazon
- Status
- operating
- Capacity
- 149 MW
- Fuel
- solar
- Commissioned
- 2020
Comparable power plants · Spain · 653 ranked
- #1HyDeal España solar farm9.5 GW · solar
- #425San Lorenzo wind farm (Spain)150 MW · wind
- #426Torozos wind farm150 MW · wind
- #427Alcalá De Guadaira Solar Park149 MW · solar
- #428Amazon Cabrera solar farm149 MW · solar
- #429Calzadilla (Iberenova) solar farm149 MW · solar
Grid connection · within 50 km
- Nearest substation
- Subestación Matallana
- Its voltage
- 400 kV
- Distance
- 8.5 km
- Strongest line nearby
- 400 kV
- Substations in range
- 6
Mapped grid infrastructure from OpenStreetMap, whose coverage is excellent in some regions and sparse in others. Nothing shown here means nothing is mappednearby — not that the site is unconnected. Lines are matched on a segment’s midpoint, so a corridor passing directly overhead can be missed; this under-reports rather than invents.
Co-located infrastructure · within 25 km
- Metway solar farm2.5 km · Power Plant · 233 MW · solar
- Alcala Cement Plant4.3 km · Cement Plant
- Riva Siderurgica Sevillana steel plant6.2 km · Iron & Steel Plant
- Subestación Matallana8.5 km · Substation / Converter
- 400 kV line9.7 km · Transmission Line
- Línea de alta tensión Carmona - Don Rodrigo y Don Rodrigo - Guillena12 km · Transmission Line
- Línea de alta tensión Arcos de la Frontera - Don Rodrigo 112 km · Transmission Line
- Subestación de Don Rodrigo13 km · Substation / Converter
- Allives solar farm13 km · Power Plant · 120 MW · solar
- Guillena (Iberdrola) solar farm13 km · Power Plant · 144 MW · solar
- Huelva-Córdoba Gas Pipeline17 km · Pipeline
- Dos Hermanas Cement Plant18 km · Cement Plant
On the interactive map
Portfolio
SOURCE: Global Energy Monitor · Global Integrated Power (CC BY 4.0)