Browse the atlas
OverWatts AtlasCountriesOwnersInsightsWireChangesSources Live map
Asset classes
- Transmission Line80,968
- Power Plant32,429
- Substation / Converter7,614
- Oil & Gas Field7,055
- Coal / Uranium Mine5,382
- Pipeline4,951
- Cement Plant3,513
- Data Centre3,283
- Iron & Steel Plant1,293
- LNG Terminal1,198
- Grid Storage965
- Iron Ore Mine949
- Chemical Plant868
- Interconnector704
- Export Terminal519
- Refinery279
- Storage / Tank Farm38
- Oil / Commodity Contract19
- Hydrogen Project18
- Carbon Capture (CCS)16
Chokepoints
Transmission Line
Línea de alta tensión Carmona - Don Rodrigo y Don Rodrigo - Guillena
- Operator
- Red Eléctrica de España
- Voltage
- 400 kV
Co-located infrastructure · within 25 km
- Carmona (Q Energy) solar farm7.2 km · Power Plant · 105 MW · solar
- Cartago A1 solar farm8.2 km · Power Plant · 264 MW · solar
- Alcalá De Guadaira Solar Park12 km · Power Plant · 149 MW · solar
- Subestación Matallana15 km · Substation / Converter
- Alcala Cement Plant16 km · Cement Plant
- Riva Siderurgica Sevillana steel plant18 km · Iron & Steel Plant
- 400 kV line18 km · Transmission Line
- Subestación Colectora Promotores Carmona19 km · Substation / Converter
- Línea de alta tensión Arcos de la Frontera - Don Rodrigo 121 km · Transmission Line
- Línea de alta tensión Arcos de la Frontera - Don Rodrigo 221 km · Transmission Line
- Subestación de Don Rodrigo22 km · Substation / Converter