Browse the atlas
OverWatts AtlasCountriesOwnersInsightsWireChangesSources Live map
Asset classes
- Transmission Line80,968
- Power Plant32,429
- Substation / Converter7,614
- Oil & Gas Field7,055
- Coal / Uranium Mine5,382
- Pipeline4,951
- Cement Plant3,513
- Data Centre3,283
- Iron & Steel Plant1,293
- LNG Terminal1,198
- Grid Storage965
- Iron Ore Mine949
- Chemical Plant868
- Interconnector704
- Export Terminal519
- Refinery279
- Storage / Tank Farm38
- Oil / Commodity Contract19
- Hydrogen Project18
- Carbon Capture (CCS)16
Chokepoints
Transmission Line
Línea de alta tensión Arcos de la Frontera - Don Rodrigo 1
- Operator
- Red Eléctrica de España
- Voltage
- 400 kV
Co-located infrastructure · within 25 km
- Línea de alta tensión Arcos de la Frontera - Don Rodrigo 233 m · Transmission Line
- Línea de alta tensión Carmona - Don Rodrigo77 m · Transmission Line
- Línea de alta tensión Don Rodrigo - Guillena84 m · Transmission Line
- Subestación de Don Rodrigo254 m · Substation / Converter
- Cartago A2 solar farm945 m · Power Plant · 155 MW · solar
- La Isla solar farm2.9 km · Power Plant · 158 MW · solar
- Don Rodrigo solar farm3.7 km · Power Plant · 225 MW · solar
- Subestación Matallana6.8 km · Substation / Converter
- Alcala Cement Plant13 km · Cement Plant
- Riva Siderurgica Sevillana steel plant13 km · Iron & Steel Plant
- Dos Hermanas Cement Plant14 km · Cement Plant
- Huelva-Córdoba Gas Pipeline19 km · Pipeline