Browse the atlas
OverWatts AtlasCountriesOwnersInsightsWireChangesSources Live map
Asset classes
- Transmission Line80,968
- Power Plant32,429
- Substation / Converter7,614
- Oil & Gas Field7,055
- Coal / Uranium Mine5,382
- Pipeline4,951
- Cement Plant3,513
- Data Centre3,283
- Iron & Steel Plant1,293
- LNG Terminal1,198
- Grid Storage965
- Iron Ore Mine949
- Chemical Plant868
- Interconnector704
- Export Terminal519
- Refinery279
- Storage / Tank Farm38
- Oil / Commodity Contract19
- Hydrogen Project18
- Carbon Capture (CCS)16
Chokepoints
Power Plant
Guillena (Iberdrola) solar farm
446th-largest power plant in Spain of 653 · top 72% worldwide (#21,410 of 29,849)
- Operator
- Iberdrola
- Owner
- Iberdrola SA
- Status
- construction
- Capacity
- 144 MW
- Fuel
- solar
Comparable power plants · Spain · 653 ranked
- #1HyDeal España solar farm9.5 GW · solar
- #444Valdompere solar farm146 MW · solar
- #445Roblasun solar farm145 MW · solar
- #446Guillena (Iberdrola) solar farm144 MW · solar
- #447Lardeiras wind farm144 MW · wind
- #448Arroyo San Miguel solar farm143 MW · solar
Grid connection · within 50 km
- Nearest substation
- Subestación de Don Rodrigo
- Its voltage
- 400 kV
- Distance
- 18 km
- Strongest line nearby
- 400 kV
- Substations in range
- 6
Mapped grid infrastructure from OpenStreetMap, whose coverage is excellent in some regions and sparse in others. Nothing shown here means nothing is mappednearby — not that the site is unconnected. Lines are matched on a segment’s midpoint, so a corridor passing directly overhead can be missed; this under-reports rather than invents.
Co-located infrastructure · within 25 km
- Carmona solar farm1.3 km · Power Plant · 400 MW · solar
- Amazon Cabrera solar farm1.8 km · Power Plant · 149 MW · solar
- Amazon Solar Farm - Extremadura3.7 km · Power Plant · 111 MW · solar
- Huelva-Córdoba Gas Pipeline5.4 km · Pipeline
- Riva Siderurgica Sevillana steel plant6.8 km · Iron & Steel Plant
- Alcala Cement Plant8.7 km · Cement Plant
- Dos Hermanas Cement Plant12 km · Cement Plant
- 400 kV line18 km · Transmission Line
- Línea de alta tensión Don Rodrigo - Guillena18 km · Transmission Line
- Línea de alta tensión Arcos de la Frontera - Don Rodrigo 118 km · Transmission Line
- Subestación de Don Rodrigo18 km · Substation / Converter
- Subestación Matallana19 km · Substation / Converter
On the interactive map
Portfolio
SOURCE: Global Energy Monitor · Global Integrated Power (CC BY 4.0)