Browse the atlas
OverWatts AtlasCountriesOwnersInsightsWireChangesSources Live map
Asset classes
- Transmission Line80,968
- Power Plant32,429
- Substation / Converter7,614
- Oil & Gas Field7,055
- Coal / Uranium Mine5,382
- Pipeline4,951
- Cement Plant3,513
- Data Centre3,283
- Iron & Steel Plant1,293
- LNG Terminal1,198
- Grid Storage965
- Iron Ore Mine949
- Chemical Plant868
- Interconnector704
- Export Terminal519
- Refinery279
- Storage / Tank Farm38
- Oil / Commodity Contract19
- Hydrogen Project18
- Carbon Capture (CCS)16
Chokepoints
Interconnector
India - North – India - West interconnection (planned)
16th-largest interconnector in India of 23 · top 29% worldwide (#202 of 704)
- Status
- proposed
- Capacity
- 1,600 MW
- Commissioned
- 2024
- Length
- 260 km
- Voltage
- 400 kV
- Connects to
- India
- Geometry
- Schematic — node to node, not a surveyed route
Comparable interconnectors · India · 23 ranked
- #1India - North – India - West interconnection36.7 GW
- #14India - North – Nepal interconnection (planned)2.0 GW
- #15India - East – India - West interconnection (planned)1.6 GW
- #16India - North – India - West interconnection (planned)1.6 GW
- #17India - South – India - West interconnection (planned)1.6 GW
- #18India - East – Nepal interconnection700 MW
Co-located infrastructure · within 25 km
- India - East – India - West interconnection (planned)0 m · Interconnector · 1.6 GW
- India - South – India - West interconnection (planned)0 m · Interconnector · 1.6 GW
- India - North – India - West interconnection (planned)0 m · Interconnector · 4.2 GW
- Mumbai507 m · Data Centre
- Rashtriya Chemicals and Fertilizers Limited Trombay Chemical Plant4.0 km · Chemical Plant
- NTT Mumbai 7 Data Center4.5 km · Data Centre
- Vikhroli5.5 km · Substation / Converter
- Aarey6.1 km · Substation / Converter
- BPCL Mumbai Chemical Plant7.0 km · Chemical Plant
- Trombay power station8.4 km · Power Plant · 750 MW · coal
- Trombay power station8.4 km · Power Plant · 150 MW · coal
- Trombay Combined Cycle power plant8.5 km · Power Plant · 180 MW · gas
On the interactive map
1600 MW planned transmission capacity is for the 'Neemuch-Chittorgarh 400 kV D/c' project with assumed later completion year of 2024 (2023-2024 estimate in ISTS Rolling Plan).
SOURCE: Global Transmission Database v0.1 (CC BY 4.0)