Browse the atlas
OverWatts AtlasCountriesOwnersInsightsWireChangesSources Live map
Asset classes
- Transmission Line80,968
- Power Plant32,429
- Substation / Converter7,614
- Oil & Gas Field7,055
- Coal / Uranium Mine5,382
- Pipeline4,951
- Cement Plant3,513
- Data Centre3,283
- Iron & Steel Plant1,293
- LNG Terminal1,198
- Grid Storage965
- Iron Ore Mine949
- Chemical Plant868
- Interconnector704
- Export Terminal519
- Refinery279
- Storage / Tank Farm38
- Oil / Commodity Contract19
- Hydrogen Project18
- Carbon Capture (CCS)16
Chokepoints
Interconnector
India - East – Nepal interconnection
18th-largest interconnector in India of 23 · top 55% worldwide (#383 of 704)
- Status
- operating
- Capacity
- 700 MW
- Length
- 649 km
- Voltage
- 400 kV
- Connects to
- Nepal
- Geometry
- Schematic — node to node, not a surveyed route
Comparable interconnectors · India · 23 ranked
- #1India - North – India - West interconnection36.7 GW
- #16India - North – India - West interconnection (planned)1.6 GW
- #17India - South – India - West interconnection (planned)1.6 GW
- #18India - East – Nepal interconnection700 MW
- #19India - East – India - Northeast interconnection (planned)670 MW
- #20India - South – Sri Lanka interconnection (planned)500 MW
Co-located infrastructure · within 25 km
- India - North – Nepal interconnection0 m · Interconnector · 70 MW
- India - East – Nepal interconnection (planned)0 m · Interconnector · 300 MW
- India - East – Nepal interconnection (planned)0 m · Interconnector · 2.0 GW
- Himal Cement Janakpur Cement Plant7.4 km · Cement Plant
- Lapche Khola hydroelectric plant9.9 km · Power Plant · 160 MW · hydro
- Rasuwa Bhotekoshi hydroelectric plant9.9 km · Power Plant · 120 MW · hydro
- United Cement Naubise Cement Plant15 km · Cement Plant
- Kepy Cement Naubise Cement Plant18 km · Cement Plant
- DMG Phulchauki Mine18 km · Iron Ore Mine
On the interactive map
Internal 400 kV within Nepal is being build which will allow the NTC for the existing 400 kV line into India (Dhalkebar-Muzaffarpur) to be increased to 1 GW (agreements are in place). This 300 MW of additional NTC is added as new planned capacity for 2024. There are a number of low voltage lines existing between IND and NPL yet are not connected to the main grids and hence not included (capacities are also unknown).
SOURCE: Global Transmission Database v0.1 (CC BY 4.0)