Browse the atlas
OverWatts AtlasCountriesOwnersInsightsWireChangesSources Live map
Asset classes
- Transmission Line80,968
- Power Plant32,429
- Substation / Converter7,614
- Oil & Gas Field7,055
- Coal / Uranium Mine5,382
- Pipeline4,951
- Cement Plant3,513
- Data Centre3,283
- Iron & Steel Plant1,293
- LNG Terminal1,198
- Grid Storage965
- Iron Ore Mine949
- Chemical Plant868
- Interconnector704
- Export Terminal519
- Refinery279
- Storage / Tank Farm38
- Oil / Commodity Contract19
- Hydrogen Project18
- Carbon Capture (CCS)16
Chokepoints
Interconnector
India - North – India - West interconnection (planned)
7th-largest interconnector in India of 23 · top 10% worldwide (#65 of 704)
- Status
- proposed
- Capacity
- 4,200 MW
- Commissioned
- 2028
- Length
- 1,149 km
- Voltage
- 765 kV
- Connects to
- India
- Geometry
- Schematic — node to node, not a surveyed route
Comparable interconnectors · India · 23 ranked
- #1India - North – India - West interconnection36.7 GW
- #5India - North – India - West interconnection (planned)8.4 GW
- #6India - East – India - South interconnection7.8 GW
- #7India - North – India - West interconnection (planned)4.2 GW
- #8India - South – India - West interconnection (planned)4.2 GW
- #9India - South – India - West interconnection (planned)4.2 GW
Co-located infrastructure · within 25 km
- India - East – India - West interconnection (planned)0 m · Interconnector · 1.6 GW
- India - North – India - West interconnection (planned)0 m · Interconnector · 1.6 GW
- India - South – India - West interconnection (planned)0 m · Interconnector · 1.6 GW
- Mumbai507 m · Data Centre
- Rashtriya Chemicals and Fertilizers Limited Trombay Chemical Plant4.0 km · Chemical Plant
- NTT Mumbai 7 Data Center4.5 km · Data Centre
- Vikhroli5.5 km · Substation / Converter
- Aarey6.1 km · Substation / Converter
- BPCL Mumbai Chemical Plant7.0 km · Chemical Plant
- Trombay power station8.4 km · Power Plant · 750 MW · coal
- Trombay power station8.4 km · Power Plant · 150 MW · coal
- Trombay Combined Cycle power plant8.5 km · Power Plant · 180 MW · gas
On the interactive map
4200 MW planned transmission capacity is for the 'Chittorgarh-Indore 765 kV D/c' project. No expected completion year can be found for this project. However, considering that its capacity is included in the total 'Capacity by 2027-28' between North and West India in the ISTS Rolling Plan we assume the latest possible completion year following the Plan horizon (2028).
SOURCE: Global Transmission Database v0.1 (CC BY 4.0)