Browse the atlas
OverWatts AtlasCountriesOwnersInsightsWireChangesSources Live map
Asset classes
- Transmission Line80,968
- Power Plant32,429
- Substation / Converter7,614
- Oil & Gas Field7,055
- Coal / Uranium Mine5,382
- Pipeline4,951
- Cement Plant3,513
- Data Centre3,283
- Iron & Steel Plant1,293
- LNG Terminal1,198
- Grid Storage965
- Iron Ore Mine949
- Chemical Plant868
- Interconnector704
- Export Terminal519
- Refinery279
- Storage / Tank Farm38
- Oil / Commodity Contract19
- Hydrogen Project18
- Carbon Capture (CCS)16
Chokepoints
Interconnector
Australia (SA) – Australia (VI) interconnection (planned)
2nd-largest interconnector in Australia of 9 · top 29% worldwide (#198 of 704)
- Status
- proposed
- Capacity
- 1,640 MW
- Commissioned
- 2031
- Length
- 240 km
- Voltage
- 275 kV
- Connects to
- Australia
- Geometry
- Schematic — node to node, not a surveyed route
Comparable interconnectors · Australia · 9 ranked
- #1Australia (SW) – Australia (VI) interconnection (planned)1.9 GW
- #2Australia (SA) – Australia (VI) interconnection (planned)1.6 GW
- #3Australia (QL) – Australia (SW) interconnection1.5 GW
- #4Australia (SW) – Australia (VI) interconnection1.0 GW
Co-located infrastructure · within 25 km
- Australia (TA) – Australia (VI) interconnection0 m · Interconnector · 594 MW
- Australia (TA) – Australia (VI) interconnection (planned)0 m · Interconnector · 618 MW
- Australia (SA) – Australia (VI) interconnection0 m · Interconnector · 820 MW
- Powertel Data Centre534 m · Data Centre
- Melbourne541 m · Data Centre
- Securiton Data Centre700 m · Data Centre
- Port Melbourne Cement Plant3.3 km · Cement Plant
- Westernport–Altona–Geelong (WAG) Oil Pipeline4.4 km · Pipeline
- Port Phillip Bay FSRU4.7 km · LNG Terminal · 4.7 Mtpa
- Newport power station6.7 km · Power Plant · 510 MW · gas
- Navarre wind farm11 km · Power Plant · 600 MW · wind
- 500 kV line13 km · Transmission Line
On the interactive map
For planned capacity it is assumed that 'Option 1' of the identified AEMO transmission expansion options will be realised. A 'Long' lead time equals 7 years post final publication year (2024) hence assumed 2031 as commissioning year.
SOURCE: Global Transmission Database v0.1 (CC BY 4.0)