Browse the atlas
OverWatts AtlasCountriesOwnersInsightsWireChangesSources Live map
Asset classes
- Transmission Line80,968
- Power Plant32,429
- Substation / Converter7,614
- Oil & Gas Field7,055
- Coal / Uranium Mine5,382
- Pipeline4,951
- Cement Plant3,513
- Data Centre3,283
- Iron & Steel Plant1,293
- LNG Terminal1,198
- Grid Storage965
- Iron Ore Mine949
- Chemical Plant868
- Interconnector704
- Export Terminal519
- Refinery279
- Storage / Tank Farm38
- Oil / Commodity Contract19
- Hydrogen Project18
- Carbon Capture (CCS)16
Chokepoints
Interconnector
Australia (TA) – Australia (VI) interconnection
9th-largest interconnector in Australia of 9 · top 62% worldwide (#435 of 704)
- Status
- operating
- Capacity
- 594 MW
- Length
- 370 km
- Connects to
- Australia
- Reverse capacity
- 478 MW
- Geometry
- Schematic — node to node, not a surveyed route
Comparable interconnectors · Australia · 9 ranked
- #1Australia (SW) – Australia (VI) interconnection (planned)1.9 GW
- #7Australia (SA) – Australia (SW) interconnection (planned)800 MW
- #8Australia (TA) – Australia (VI) interconnection (planned)618 MW
- #9Australia (TA) – Australia (VI) interconnection594 MW
Co-located infrastructure · within 25 km
- Australia (TA) – Australia (VI) interconnection (planned)0 m · Interconnector · 618 MW
- Australia (SA) – Australia (VI) interconnection0 m · Interconnector · 820 MW
- Australia (SW) – Australia (VI) interconnection0 m · Interconnector · 1.0 GW
- Powertel Data Centre534 m · Data Centre
- Melbourne541 m · Data Centre
- Securiton Data Centre700 m · Data Centre
- Port Melbourne Cement Plant3.3 km · Cement Plant
- Westernport–Altona–Geelong (WAG) Oil Pipeline4.4 km · Pipeline
- Port Phillip Bay FSRU4.7 km · LNG Terminal · 4.7 Mtpa
- Newport power station6.7 km · Power Plant · 510 MW · gas
- Navarre wind farm11 km · Power Plant · 600 MW · wind
- 500 kV line13 km · Transmission Line
On the interactive map
For planned capacity it is assumed that 'Option 1' of the identified AEMO transmission expansion options will be realised. The net additional network capacity is assumed to be the identified transmission limits if this project gets initiated (1212 MW TAS to VIC, 962 MW VIC to TAS) - the existing capacities.
SOURCE: Global Transmission Database v0.1 (CC BY 4.0)