Interconnector

Australia (TA) – Australia (VI) interconnection (planned)

Australia

8th-largest interconnector in Australia of 9 · top 59% worldwide (#415 of 704)

Status
proposed
Capacity
618 MW
Commissioned
2029
Length
598 km
Connects to
Australia
Reverse capacity
484 MW
Geometry
Schematic — node to node, not a surveyed route

Comparable interconnectors · Australia · 9 ranked

All interconnectors in Australia

Co-located infrastructure · within 25 km

On the interactive map

Open the interactive map →

For planned capacity it is assumed that 'Option 1' of the identified AEMO transmission expansion options will be realised. The net additional network capacity is assumed to be the identified transmission limits if this project gets initiated (1212 MW TAS to VIC, 962 MW VIC to TAS) - the existing capacities.

SOURCE: Global Transmission Database v0.1 (CC BY 4.0)