Browse the atlas
OverWatts AtlasCountriesOwnersInsightsWireChangesSources Live map
Asset classes
- Transmission Line80,968
- Power Plant32,429
- Substation / Converter7,614
- Oil & Gas Field7,055
- Coal / Uranium Mine5,382
- Pipeline4,951
- Cement Plant3,513
- Data Centre3,283
- Iron & Steel Plant1,293
- LNG Terminal1,198
- Grid Storage965
- Iron Ore Mine949
- Chemical Plant868
- Interconnector704
- Export Terminal519
- Refinery279
- Storage / Tank Farm38
- Oil / Commodity Contract19
- Hydrogen Project18
- Carbon Capture (CCS)16
Chokepoints
Pipeline
Hastings to Altona Ethane Pipeline
- Operator
- BHP Group Ltd, Esso Australia Resources
- Status
- operating
- Commissioned
- 1972
- Length
- 61.35 km
- Commodity
- products
Co-located infrastructure · within 25 km
- Telstra Clayton Data Centre9.6 km · Data Centre
- Fujitsu Data Centre10 km · Data Centre
- 500 kV line14 km · Transmission Line
- Rowville Terminal Station14 km · Substation / Converter
- DXC Technology17 km · Data Centre
- Cranbourne Terminal Station18 km · Substation / Converter
- Westernport–Altona–Geelong (WAG) Oil Pipeline20 km · Pipeline
- Port Phillip Bay FSRU22 km · LNG Terminal · 4.7 Mtpa
- Australia (TA) – Australia (VI) interconnection24 km · Interconnector · 594 MW
- Australia (TA) – Australia (VI) interconnection (planned)24 km · Interconnector · 618 MW
- Australia (SA) – Australia (VI) interconnection24 km · Interconnector · 820 MW
- Port Melbourne Cement Plant25 km · Cement Plant
On the interactive map
Australia → Australia
SOURCE: Global Energy Monitor · Global Gas & Oil/NGL Pipelines (GGIT / GOIT) (CC BY 4.0)