Browse the atlas
Asset classes
- Transmission Line80,968
- Power Plant32,429
- Substation / Converter7,614
- Oil & Gas Field7,055
- Coal / Uranium Mine5,382
- Pipeline4,951
- Cement Plant3,513
- Data Centre3,283
- Iron & Steel Plant1,293
- LNG Terminal1,198
- Grid Storage965
- Iron Ore Mine949
- Chemical Plant868
- Interconnector704
- Export Terminal519
- Refinery279
- Storage / Tank Farm38
- Oil / Commodity Contract19
- Hydrogen Project18
- Carbon Capture (CCS)16
Chokepoints
Uzbekistan · electricity network
Uzbekistan power grid
OverWatts maps 11,400 km of Uzbekistan's electricity transmission network across 1,554 line segments and 6 substations, the 33rd most-mapped grid of 153 countries. Its backbone is high voltage (220–379 kV), carrying 8,833 km — 78% of the mapped length, with the highest tagged voltage at 500 kV. That works out to 24.7 km per 1,000 km² of land — moderate OpenStreetMap coverage, ahead of 65% of mapped countries. It is connected to 5 neighbouring grids by 5,980 MW of existing cross-border transfer capacity.
OpenStreetMap coverage
This grades how completely OpenStreetMap has drawn Uzbekistan's network — not how much network exists. Large, sparsely-populated countries score low for geographic reasons alone, and every kilometre here is mapped length, so the totals are a floor rather than an operator-reported figure. 0% of segments carry a real line name and 3% an operator tag.
Mapped line length by voltage
- 380–764 kV2,542 km 22%
- 220–379 kV8,833 km 78%
1,554 segments · a segment is credited to the country containing its midpoint, so a border-crossing line counts once, on one side.
Cross-border links from Uzbekistan
- Kyrgyzstan2.8 GW
- Kazakhstan1.0 GW
- Tajikistan850 MW
- Turkmenistan850 MW
- Afghanistan450 MW
6.0 GW existing · capacities from the Global Transmission Database v0.1 (CC BY 4.0), existing as of 2023
On the interactive map
Load against the network
Where there is room to connect a new load depends on published hosting capacity, which most operators release only as their own map. OverWatts does not yet ingest those feeds, so these are the density measures the open data supports — generation and mapped demand against mapped network — not a headroom figure.
Operators tagged on Uzbekistan's network
- UzbekEnergo52 100%
Segment counts from OSM `operator` tags, merged across spellings. Present on 3% of segments — this ranks who is recorded, not market share.
How Uzbekistan compares · mapped grid by country
- 1. People's Republic of China624,300 km
- 31. Morocco11,700 km
- 32. Poland11,600 km
- 33. Uzbekistan11,400 km
- 34. Libya11,200 km
- 35. Ethiopia9,988 km
Frequently asked
- How big is Uzbekistan's transmission network?
- OverWatts maps 11,400 km of transmission line in Uzbekistan, across 1,554 segments, plus 6 substations. This is mapped length from OpenStreetMap, not an operator-reported total — where OSM is incomplete the figure is a floor, never a ceiling.
- What voltage is Uzbekistan's grid?
- Most of the mapped network is high voltage (220–379 kV): 8,833 km of 11,400 km. The highest voltage tagged anywhere in the country is 500 kV.
- How complete is the grid map for Uzbekistan?
- Moderate — 24.7 km of mapped line per 1,000 km² of land, ahead of 65% of the 153 countries with any mapped grid. Coverage grades how completely OpenStreetMap has drawn the network, not how much network exists; large, sparsely-populated countries score low for geographic reasons alone.
- Who operates the grid in Uzbekistan?
- UzbekEnergo are tagged as operators on mapped segments. Operator tags are present on 3% of Uzbekistan's segments, so this ranks who is *recorded*, not market share.
- What interconnectors connect Uzbekistan to its neighbours?
- 5,980 MW of cross-border transfer capacity to Kyrgyzstan, Kazakhstan, Tajikistan, Turkmenistan, Afghanistan. Capacities are from the Global Transmission Database (v1.0, 2023).
Elsewhere in Uzbekistan
Network geometry: OpenStreetMap (ODbL) © OpenStreetMap contributors, ingested and measured by OverWatts · derived 2026-07-26. Counts every mapped line of 220 kV and above; the map layer draws the ≥380 kV backbone only, so it shows less than is measured here.