Browse the atlas
Asset classes
- Transmission Line80,968
- Power Plant32,429
- Substation / Converter7,614
- Oil & Gas Field7,055
- Coal / Uranium Mine5,382
- Pipeline4,951
- Cement Plant3,513
- Data Centre3,283
- Iron & Steel Plant1,293
- LNG Terminal1,198
- Grid Storage965
- Iron Ore Mine949
- Chemical Plant868
- Interconnector704
- Export Terminal519
- Refinery279
- Storage / Tank Farm38
- Oil / Commodity Contract19
- Hydrogen Project18
- Carbon Capture (CCS)16
Chokepoints
Kazakhstan · electricity network
Kazakhstan power grid
OverWatts maps 31,900 km of Kazakhstan's electricity transmission network across 1,073 line segments and 15 substations, the 11th most-mapped grid of 153 countries. Its backbone is high voltage (220–379 kV), carrying 22,200 km — 70% of the mapped length, with the highest tagged voltage at 500 kV. That works out to 11.7 km per 1,000 km² of land — partial OpenStreetMap coverage, ahead of 42% of mapped countries. It is connected to 3 neighbouring grids by 4,140 MW of existing cross-border transfer capacity.
OpenStreetMap coverage
This grades how completely OpenStreetMap has drawn Kazakhstan's network — not how much network exists. Large, sparsely-populated countries score low for geographic reasons alone, and every kilometre here is mapped length, so the totals are a floor rather than an operator-reported figure. 0% of segments carry a real line name and 0% an operator tag.
Mapped line length by voltage
- 380–764 kV9,739 km 30%
- 220–379 kV22,200 km 70%
1,073 segments · a segment is credited to the country containing its midpoint, so a border-crossing line counts once, on one side.
Cross-border links from Kazakhstan
- Kyrgyzstan2.8 GW
- Uzbekistan1.0 GW
- Russia280 MW
- Russia50 MW
- Russia10 MW
- Russia10 MW
4.1 GW existing · capacities from the Global Transmission Database v0.1 (CC BY 4.0), existing as of 2023
On the interactive map
Load against the network
Where there is room to connect a new load depends on published hosting capacity, which most operators release only as their own map. OverWatts does not yet ingest those feeds, so these are the density measures the open data supports — generation and mapped demand against mapped network — not a headroom figure.
Operators tagged on Kazakhstan's network
- KEGOC1 100%
Segment counts from OSM `operator` tags, merged across spellings. Present on 0% of segments — this ranks who is recorded, not market share.
How Kazakhstan compares · mapped grid by country
- 1. People's Republic of China624,300 km
- 9. France34,500 km
- 10. South Africa33,200 km
- 11. Kazakhstan31,900 km
- 12. Spain29,800 km
- 13. Saudi Arabia27,300 km
Frequently asked
- How big is Kazakhstan's transmission network?
- OverWatts maps 31,900 km of transmission line in Kazakhstan, across 1,073 segments, plus 15 substations. This is mapped length from OpenStreetMap, not an operator-reported total — where OSM is incomplete the figure is a floor, never a ceiling.
- What voltage is Kazakhstan's grid?
- Most of the mapped network is high voltage (220–379 kV): 22,200 km of 31,900 km. The highest voltage tagged anywhere in the country is 500 kV.
- How complete is the grid map for Kazakhstan?
- Partial — 11.7 km of mapped line per 1,000 km² of land, ahead of 42% of the 153 countries with any mapped grid. Coverage grades how completely OpenStreetMap has drawn the network, not how much network exists; large, sparsely-populated countries score low for geographic reasons alone.
- Who operates the grid in Kazakhstan?
- KEGOC are tagged as operators on mapped segments. Operator tags are present on 0% of Kazakhstan's segments, so this ranks who is *recorded*, not market share.
- What interconnectors connect Kazakhstan to its neighbours?
- 4,140 MW of cross-border transfer capacity to Kyrgyzstan, Uzbekistan, Russia. Capacities are from the Global Transmission Database (v1.0, 2023).
Elsewhere in Kazakhstan
Network geometry: OpenStreetMap (ODbL) © OpenStreetMap contributors, ingested and measured by OverWatts · derived 2026-07-26. Counts every mapped line of 220 kV and above; the map layer draws the ≥380 kV backbone only, so it shows less than is measured here.