Browse the atlas
Asset classes
- Transmission Line80,968
- Power Plant32,429
- Substation / Converter7,614
- Oil & Gas Field7,055
- Coal / Uranium Mine5,382
- Pipeline4,951
- Cement Plant3,513
- Data Centre3,283
- Iron & Steel Plant1,293
- LNG Terminal1,198
- Grid Storage965
- Iron Ore Mine949
- Chemical Plant868
- Interconnector704
- Export Terminal519
- Refinery279
- Storage / Tank Farm38
- Oil / Commodity Contract19
- Hydrogen Project18
- Carbon Capture (CCS)16
Chokepoints
Uzbekistan — Energy Infrastructure
OverWatts maps 160 energy assets in Uzbekistan across 9 layers — the 50th-largest mapped base of 157 countries. They include 86 power plants, 22 cement plants and 18 oil & gas fields. Operating generation capacity is 22.4 GW, led by gas at 64%.
The companies named on the most assets are JSC Uzbekgidroenergo (19), Uzbekneftegaz JSC (12) and ACWA Power Co (11), counting both ownership and operatorship. Half of Uzbekistan's mapped assets in service predate 2017 (median commissioning year of the 82 with a known date), 41 came online in the past decade and the oldest still listed is Bekabadcement Cement Plant, dating from 1926. 40+ projects are under construction or proposed, led by Aral wind farm (5.0 GW).
Operating generation capacity by fuel
Utility-scale sites of 100 MW and above. Distributed generation — rooftop solar especially — is outside the tracker, so this runs below national installed capacity.
- gas14.4 GW +7.6 GW planned
- solar2.5 GW +4.7 GW planned
- coal2.4 GW +348 MW planned
- wind1.6 GW +13.3 GW planned
- hydro1.5 GW +2.2 GW planned
- nuclear0 MW +2.7 GW planned
Electricity generated by fuel · 2025
What the fleet actually produced — distinct from the installed capacity above.
- gas62.7 TWh 72%
- solar6.5 TWh 7%
- hydro6.3 TWh 7%
- coal5.7 TWh 7%
- wind4.0 TWh 5%
- oil1.5 TWh 2%
Ember · source · CC-BY-4.0
On the interactive map
Browse by asset class
Under construction & proposed
- Aral wind farmPower Plants · 5.0 GW · wind
- Navoi nuclear power plantPower Plants · 2.4 GW · nuclear · 2028
- Sirdaryo II power stationPower Plants · 1.6 GW · gas · 2026
- Surkhandarya power stationPower Plants · 1.6 GW · gas · 2027
- Kungrad (ACWA Power) wind farmPower Plants · 1.5 GW · wind · 2027
- Talimarjan power stationPower Plants · 1.1 GW · gas · 2026
- Sazagan solar farmPower Plants · 1.0 GW · solar
- AMEA Karakalpakstan wind farmPower Plants · 1.0 GW · wind
- Kungrad (Sany Renewable) wind farmPower Plants · 1.0 GW · wind
- Mingbulak wind farmPower Plants · 1.0 GW · wind
- Navoi wind farmPower Plants · 1.0 GW · wind
- Navoi power stationPower Plants · 650 MW · gas · 2026
- Navoi power stationPower Plants · 650 MW · gas
- Upper Pskem Pumped Storage hydroelectric plantPower Plants · 600 MW · hydro · 2030
- Upper Pskem Pumped Storage hydroelectric plantGrid Storage · 600 MW · 2030
- Cengiz Enerji Jizzakh CHP power stationPower Plants · 550 MW · gas · 2026
- Huadian Jizzakh solar farmPower Plants · 500 MW · solar
- Hyper Partners solar farmPower Plants · 500 MW · solar
- Tepelen Group solar farmPower Plants · 500 MW · solar
- Akpetki wind farmPower Plants · 500 MW · wind
- Buzaubay wind farmPower Plants · 500 MW · wind
- Kungrad (ACWA Power) wind farmPower Plants · 500 MW · wind
- Karateren hydroelectric plantPower Plants · 500 MW · hydro · 2030
- Karateren hydroelectric plantGrid Storage · 500 MW · 2030
- Sherabad solar farmPower Plants · 457 MW · solar · 2026
- Cengiz Enerji Sirdaryo 2 power stationPower Plants · 450 MW · gas
- Andijan (Sunview) solar farmPower Plants · 400 MW · solar
- Pskem hydroelectric plantPower Plants · 400 MW · hydro · 2026
- Jizzakh nuclear power plantPower Plants · 330 MW · nuclear · 2029
- Andijan (PowerChina) solar farmPower Plants · 300 MW · solar
- Guzar solar farmPower Plants · 300 MW · solar · 2027
- Karmana solar farmPower Plants · 300 MW · solar
- Artemisya wind farmPower Plants · 300 MW · wind
- Gijduvan (ACWA Power) wind farmPower Plants · 300 MW · wind
- Jizzakh wind farmPower Plants · 250 MW · wind
- Samarkand wind farmPower Plants · 250 MW · wind
- Mubarek power stationPower Plants · 216 MW · gas · 2027
- Fergana (Sunview) solar farmPower Plants · 200 MW · solar
- Beruniy wind farmPower Plants · 200 MW · wind
- Khodzhikent hydroelectric plantPower Plants · 200 MW · hydro
Largest assets
- Aral wind farmPower Plants · 5.0 GW · wind
- Sirdaryo power stationPower Plants · 3.2 GW · gas · 1972
- Navoi nuclear power plantPower Plants · 2.4 GW · nuclear · 2028
- Navoi power stationPower Plants · 2.2 GW · gas · 1964
- Novo-Angren power stationPower Plants · 2.1 GW · coal · 1985
- Tashkent power stationPower Plants · 1.8 GW · gas · 1965
- Talimarjan power stationPower Plants · 1.7 GW · gas · 2004
- Sirdaryo II power stationPower Plants · 1.6 GW · gas · 2026
- Surkhandarya power stationPower Plants · 1.6 GW · gas · 2027
- ACWA Power Sirdaryo I power stationPower Plants · 1.5 GW · gas · 2024
- Kungrad (ACWA Power) wind farmPower Plants · 1.5 GW · wind · 2027
- Talimarjan power stationPower Plants · 1.1 GW · gas · 2026
- Sazagan solar farmPower Plants · 1.0 GW · solar
- AMEA Karakalpakstan wind farmPower Plants · 1.0 GW · wind
- Kungrad (Sany Renewable) wind farmPower Plants · 1.0 GW · wind
- Mingbulak wind farmPower Plants · 1.0 GW · wind
- Navoi wind farmPower Plants · 1.0 GW · wind
- Takhiatash power stationPower Plants · 980 MW · gas · 1987
- Turakurgan power stationPower Plants · 900 MW · gas · 2019
- Charvak hydroelectric plantPower Plants · 666 MW · hydro · 1977
- Navoi power stationPower Plants · 650 MW · gas · 2026
- Navoi power stationPower Plants · 650 MW · gas
- Upper Pskem Pumped Storage hydroelectric plantPower Plants · 600 MW · hydro · 2030
- Upper Pskem Pumped Storage hydroelectric plantGrid Storage · 600 MW · 2030
- Cengiz Enerji Jizzakh CHP power stationPower Plants · 550 MW · gas · 2026
Biggest owners & operators
- JSC Uzbekgidroenergo19 12%
- Uzbekneftegaz JSC12 8%
- ACWA Power Co11 7%
- Uztransgaz8 5%
- Masdar Clean Energy7 4%
- Thermal Power Stations JSC7 4%
- Cengiz Enerji Sanayii ve Ticaret AŞ4 3%
- Uzbekkomir JSC4 3%
Counts an asset once per company named as its owner or operator; a joint venture counts for each partner.
Frequently asked
- How many energy assets does Uzbekistan have?
- OverWatts maps 160 in Uzbekistan across 9 asset classes — the 50th-largest mapped base of the 157 countries covered.
- How much electricity generation capacity does Uzbekistan have?
- About 22.4 GW operating across 38 plants, mostly gas 64%, solar 11% and coal 11%.
- Who owns Uzbekistan's energy infrastructure?
- JSC Uzbekgidroenergo is named as owner or operator on the most mapped assets (19), followed by Uzbekneftegaz JSC (12), ACWA Power Co (11) and Uztransgaz (8).
- What energy projects are under construction in Uzbekistan?
- The largest under way or proposed are Aral wind farm (5.0 GW), Navoi nuclear power plant (2.4 GW) and Sirdaryo II power station (1.6 GW).