Browse the atlas
OverWatts AtlasCountriesOwnersInsightsWireChangesSources Live map
Asset classes
- Transmission Line80,968
- Power Plant32,429
- Substation / Converter7,614
- Oil & Gas Field7,055
- Coal / Uranium Mine5,382
- Pipeline4,951
- Cement Plant3,513
- Data Centre3,283
- Iron & Steel Plant1,293
- LNG Terminal1,198
- Grid Storage965
- Iron Ore Mine949
- Chemical Plant868
- Interconnector704
- Export Terminal519
- Refinery279
- Storage / Tank Farm38
- Oil / Commodity Contract19
- Hydrogen Project18
- Carbon Capture (CCS)16
Chokepoints
Interconnector
United States (US-FLA-FPC) – United States (US-FLA-FPL) interconnection
42nd-largest interconnector in United States of 159 · top 37% worldwide (#255 of 704)
- Status
- operating
- Capacity
- 1,222 MW
- Length
- 331 km
- Connects to
- United States
- Reverse capacity
- 212 MW
- Geometry
- Schematic — node to node, not a surveyed route
Comparable interconnectors · United States · 159 ranked
- #1United States (US-MIDW-MISO) – United States (US-MIDA-PJM) interconnection10.1 GW
- #40United States (US-NW-AVRN) – United States (US-NW-BPAT) interconnection1.3 GW
- #41United States (US-CAR-DUK) – United States (US-MIDA-PJM) interconnection1.2 GW
- #42United States (US-FLA-FPC) – United States (US-FLA-FPL) interconnection1.2 GW
- #43United States (US-CAR-CPLE) – United States (US-MIDA-PJM) interconnection1.2 GW
- #44United States (US-SW-AZPS) – United States (US-SW-PNM) interconnection1.2 GW
Co-located infrastructure · within 25 km
- NAP of the Americas1.7 km · Data Centre
- American LNG Hialeah Terminal9.1 km · LNG Terminal · 0.08 Mtpa
- NocRoom Miami IT Services11 km · Data Centre
- United States (US-FLA-FPL) – United States (US-FLA-HST) interconnection13 km · Interconnector · 102 MW
- Pennusco Cement Plant20 km · Cement Plant
- Miami Cement Plant21 km · Cement Plant
- 500 kV line23 km · Transmission Line
- Levee Substation FPL23 km · Substation / Converter
- Quarry Sub FPL to Levee Sub FPL #2500KV23 km · Transmission Line
- Quarry Sub FPL to Levee Sub FPL #1 500KV23 km · Transmission Line
- Quarry Substation FPL23 km · Substation / Converter
On the interactive map
Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's. — No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report nor on the website of Duke Energy.
SOURCE: Global Transmission Database v0.1 (CC BY 4.0)