Interconnector

United States (US-CAR-CPLE) – United States (US-MIDA-PJM) interconnection

United States

43rd-largest interconnector in United States of 159 · top 37% worldwide (#256 of 704)

Status
operating
Capacity
1,219 MW
Length
851 km
Connects to
United States
Reverse capacity
1,183 MW
Geometry
Schematic — node to node, not a surveyed route

Comparable interconnectors · United States · 159 ranked

All interconnectors in United States

Co-located infrastructure · within 25 km

On the interactive map

Open the interactive map →

Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's. — No indicated planned interconnections from CPLE (Duke Energy Progress) to PJM.

SOURCE: Global Transmission Database v0.1 (CC BY 4.0)