Browse the atlas
OverWatts AtlasCountriesOwnersInsightsWireChangesSources Live map
Asset classes
- Transmission Line80,968
- Power Plant32,429
- Substation / Converter7,614
- Oil & Gas Field7,055
- Coal / Uranium Mine5,382
- Pipeline4,951
- Cement Plant3,513
- Data Centre3,283
- Iron & Steel Plant1,293
- LNG Terminal1,198
- Grid Storage965
- Iron Ore Mine949
- Chemical Plant868
- Interconnector704
- Export Terminal519
- Refinery279
- Storage / Tank Farm38
- Oil / Commodity Contract19
- Hydrogen Project18
- Carbon Capture (CCS)16
Chokepoints
Interconnector
United States (US-FLA-FPL) – United States (US-FLA-HST) interconnection
147th-largest interconnector in United States of 159 · top 95% worldwide (#665 of 704)
- Status
- operating
- Capacity
- 102 MW
- Length
- 13 km
- Connects to
- United States
- Reverse capacity
- 88 MW
- Geometry
- Schematic — node to node, not a surveyed route
Comparable interconnectors · United States · 159 ranked
- #1United States (US-MIDW-MISO) – United States (US-MIDA-PJM) interconnection10.1 GW
- #145United States (US-NW-WAUW) – United States (US-NW-WACM) interconnection109 MW
- #146United States (US-FLA-JEA) – United States (US-FLA-SEC) interconnection105 MW
- #147United States (US-FLA-FPL) – United States (US-FLA-HST) interconnection102 MW
- #148United States (US-FLA-FMPP) – United States (US-FLA-JEA) interconnection75 MW
- #149United States (US-CAL-IID) – United States (US-SW-WALC) interconnection75 MW
Co-located infrastructure · within 25 km
- American LNG Hialeah Terminal6.8 km · LNG Terminal · 0.08 Mtpa
- Pennusco Cement Plant7.3 km · Cement Plant
- NocRoom Miami IT Services8.8 km · Data Centre
- United States (US-FLA-FPC) – United States (US-FLA-FPL) interconnection13 km · Interconnector · 1.2 GW
- Andytown Sub FPL to Levee Sub FPL #2 500KV14 km · Transmission Line
- Andytown Sub FPL to Levee Sub FPL #1 500KV14 km · Transmission Line
- 500 kV line14 km · Transmission Line
- Levee Substation FPL15 km · Substation / Converter
- NAP of the Americas15 km · Data Centre
- Miami Cement Plant15 km · Cement Plant
- Quarry Substation FPL15 km · Substation / Converter
- FPL Andytown Substation23 km · Substation / Converter
On the interactive map
Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's. — No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.
SOURCE: Global Transmission Database v0.1 (CC BY 4.0)