Browse the atlas
OverWatts AtlasCountriesOwnersInsightsWireChangesSources Live map
Asset classes
- Transmission Line80,968
- Power Plant32,429
- Substation / Converter7,614
- Oil & Gas Field7,055
- Coal / Uranium Mine5,382
- Pipeline4,951
- Cement Plant3,513
- Data Centre3,283
- Iron & Steel Plant1,293
- LNG Terminal1,198
- Grid Storage965
- Iron Ore Mine949
- Chemical Plant868
- Interconnector704
- Export Terminal519
- Refinery279
- Storage / Tank Farm38
- Oil / Commodity Contract19
- Hydrogen Project18
- Carbon Capture (CCS)16
Chokepoints
Interconnector
Russia - Far Eastern Federal District – Russia - Siberian Federal District interconnection (planned)
6th-largest interconnector in Russia of 6 · top 72% worldwide (#502 of 704)
- Status
- proposed
- Capacity
- 450 MW
- Commissioned
- 2028
- Length
- 3,715 km
- Voltage
- 220 kV
- Connects to
- Russia
- Reverse capacity
- 350 MW
- Geometry
- Schematic — node to node, not a surveyed route
Comparable interconnectors · Russia · 6 ranked
- #1Russia - Central Federal District – Russia - Volga Federal District interconnection3.5 GW
- #4Russia - Central Federal District – Russia - South interconnection2.4 GW
- #5Russia - Central Federal District – Russia - Northwestern Federal District interconnection1.5 GW
- #6Russia - Far Eastern Federal District – Russia - Siberian Federal District interconnection (planned)450 MW
Co-located infrastructure · within 25 km
- Kazakhstan – Russia - Siberian Federal District interconnection0 m · Interconnector · 50 MW
- Mongolia – Russia - Siberian Federal District interconnection0 m · Interconnector · 345 MW
- Novosibirsk-2 power station4.6 km · Power Plant · 285 MW · coal
- Novosibirsk-3 power station4.9 km · Power Plant · 447 MW · coal
- Novosibirsk-3 power station4.9 km · Power Plant · 150 MW · coal
- Rostelecom Novosibirsk5.3 km · Data Centre
- Адман8.6 km · Data Centre
On the interactive map
Note that the existing capacities are based on a conference paper from 2010 and are outdated. However no more recent capacities (in MW) can be found due to data limitations. Planned capacities by 2028 are given on the bottom of the page of the provided source (translated from Russian). Proposed capacities beyond 2028 are not included given that the capacities are following suggest project which are as of yet not being implemented.
SOURCE: Global Transmission Database v0.1 (CC BY 4.0)