Browse the atlas
OverWatts AtlasCountriesOwnersInsightsWireChangesSources Live map
Asset classes
- Transmission Line80,968
- Power Plant32,429
- Substation / Converter7,614
- Oil & Gas Field7,055
- Coal / Uranium Mine5,382
- Pipeline4,951
- Cement Plant3,513
- Data Centre3,283
- Iron & Steel Plant1,293
- LNG Terminal1,198
- Grid Storage965
- Iron Ore Mine949
- Chemical Plant868
- Interconnector704
- Export Terminal519
- Refinery279
- Storage / Tank Farm38
- Oil / Commodity Contract19
- Hydrogen Project18
- Carbon Capture (CCS)16
Chokepoints
Interconnector
Russia - Central Federal District – Russia - Northwestern Federal District interconnection
5th-largest interconnector in Russia of 6 · top 30% worldwide (#210 of 704)
- Status
- operating
- Capacity
- 1,500 MW
- Length
- 473 km
- Voltage
- 750 kV
- Connects to
- Russia
- Geometry
- Schematic — node to node, not a surveyed route
Comparable interconnectors · Russia · 6 ranked
- #1Russia - Central Federal District – Russia - Volga Federal District interconnection3.5 GW
- #3Russia - Volga Federal District – Russia - Ural federal district interconnection3.0 GW
- #4Russia - Central Federal District – Russia - South interconnection2.4 GW
- #5Russia - Central Federal District – Russia - Northwestern Federal District interconnection1.5 GW
- #6Russia - Far Eastern Federal District – Russia - Siberian Federal District interconnection (planned)450 MW
Co-located infrastructure · within 25 km
- Belarus – Russia - Northwestern Federal District interconnection0 m · Interconnector · 570 MW
- Urals Crude184 m · Oil / Commodity Contract
- Дата-центр Миран-22.0 km · Data Centre
- Дата-центр Миран-12.1 km · Data Centre
- DataCenter Three Seven3.3 km · Data Centre
- Василеостровская3.6 km · Substation / Converter
- Vyborg CHP power station4.0 km · Power Plant · 223 MW · gas
- Завод Ильич4.2 km · Substation / Converter
- Волхов-Северная4.2 km · Substation / Converter
- Vasileostrovskaya power station4.8 km · Power Plant · 110 MW · gas
- Central CHP-1 (TGC-1) power station4.9 km · Power Plant · 100 MW · gas
- Gryazovets-Leningrad Gas Pipeline — II20 km · Pipeline
On the interactive map
Note that the existing capacities are based on a conference paper from 2010 and are outdated. However no more recent capacities (in MW) can be found due to data limitations. Voltage and Distance values (750 kV and 473 km) has been added for a new line commissioned in 2022, however, no MW values have been found for this line. No planned capacities reported in Russian development plan (translated from Russian).
SOURCE: Global Transmission Database v0.1 (CC BY 4.0)