Browse the atlas
OverWatts AtlasCountriesOwnersInsightsWireChangesSources Live map
Asset classes
- Transmission Line80,968
- Power Plant32,429
- Substation / Converter7,614
- Oil & Gas Field7,055
- Coal / Uranium Mine5,382
- Pipeline4,951
- Cement Plant3,513
- Data Centre3,283
- Iron & Steel Plant1,293
- LNG Terminal1,198
- Grid Storage965
- Iron Ore Mine949
- Chemical Plant868
- Interconnector704
- Export Terminal519
- Refinery279
- Storage / Tank Farm38
- Oil / Commodity Contract19
- Hydrogen Project18
- Carbon Capture (CCS)16
Chokepoints
Interconnector
Laos – Myanmar interconnection (planned)
4th-largest interconnector in Laos of 5 · top 61% worldwide (#425 of 704)
- Status
- proposed
- Capacity
- 600 MW
- Commissioned
- 2026
- Length
- 230 km
- Voltage
- 230 kV
- Connects to
- Myanmar
- Geometry
- Schematic — node to node, not a surveyed route
Comparable interconnectors · Laos · 5 ranked
- #1Laos – Thailand interconnection5.4 GW
- #2Laos – Viet Nam interconnection (planned)2.0 GW
- #3Laos – Viet Nam interconnection (planned)1.0 GW
- #4Laos – Myanmar interconnection (planned)600 MW
- #5Laos – Viet Nam interconnection538 MW
Co-located infrastructure · within 25 km
- India - Northeast – Myanmar interconnection0 m · Interconnector · 3 MW
- China (YU) – Myanmar interconnection0 m · Interconnector · 228 MW
- China (YU) – Myanmar interconnection (planned)0 m · Interconnector · 1.0 GW
- Ahlone (Toyo Thai) power station3.6 km · Power Plant · 121 MW · gas
- Ahlone power station3.7 km · Power Plant · 152 MW · gas
- Ahlone LNG Terminal4.3 km · LNG Terminal
- MCV LNG Terminal6.2 km · LNG Terminal · 0.4 Mtpa
- Thaketa (U Energy) power station7.3 km · Power Plant · 106 MW · gas
- Thanlyin Refinery13 km · Refinery · 28 kb/d
- Yojin Thilawa Cement Plant16 km · Cement Plant
- YTL Thilawa Cement Plant17 km · Cement Plant
- 500 kV line20 km · Transmission Line
On the interactive map
MoU signed in 2023 for transmission capacity of 600 MW to be reached by 2026.
SOURCE: Global Transmission Database v0.1 (CC BY 4.0)