Asset classes
- Transmission Line80,968
- Power Plant32,429
- Substation / Converter7,614
- Oil & Gas Field7,055
- Coal / Uranium Mine5,382
- Pipeline4,951
- Cement Plant3,513
- Data Centre3,283
- Iron & Steel Plant1,293
- LNG Terminal1,198
- Grid Storage965
- Iron Ore Mine949
- Chemical Plant868
- Interconnector704
- Export Terminal519
- Refinery279
- Storage / Tank Farm38
- Oil / Commodity Contract19
- Hydrogen Project18
- Carbon Capture (CCS)16
Chokepoints
Interconnector
Ecuador – Peru interconnection
666th-largest interconnector worldwide · top 95% worldwide (#666 of 704)
- Status
- operating
- Capacity
- 100 MW
- Length
- 104 km
- Voltage
- 230 kV
- Connects to
- Peru
- Geometry
- Schematic — node to node, not a surveyed route
Comparable interconnectors · worldwide · 704 ranked
- #1India - North – India - West interconnection36.7 GW
- #664United States (US-FLA-JEA) – United States (US-FLA-SEC) interconnection105 MW
- #665United States (US-FLA-FPL) – United States (US-FLA-HST) interconnection102 MW
- #666Ecuador – Peru interconnection100 MW
- #667Burkina Faso – Ghana interconnection100 MW
- #668Canada - Manitoba – Canada - Saskatchewan interconnection (planned)100 MW
Co-located infrastructure · within 25 km
- Bolivia – Peru interconnection (planned)0 m · Interconnector · 150 MW
- Chile – Peru interconnection (planned)0 m · Interconnector · 200 MW
- Ecuador – Peru interconnection (planned)0 m · Interconnector · 550 MW
- Centro de Datos Win Santa Catalina3.7 km · Data Centre
- Santa Rosa power station3.7 km · Power Plant · 450 MW · gas
- Centro de Entrenamiento Tecnológico5.3 km · Data Centre
- El Caño hydroelectric plant5.8 km · Power Plant · 120 MW · hydro
- Centro de Datos Monterrico7.6 km · Data Centre
- Ventanilla power station16 km · Power Plant · 532 MW · gas
- Cajamarquilla Cement Plant17 km · Cement Plant
- 500 kV line20 km · Transmission Line
- Atocongo Cement Plant20 km · Cement Plant
On the interactive map
Assumed capacities for the newly planned 500 kV line equals the reported maximum directional flow in 2024 (600 MW ECU - PER, 650 MW PER - ECU) - the existing capacities (100 MW).
SOURCE: Global Transmission Database v0.1 (CC BY 4.0)