Asset classes
- Transmission Line80,968
- Power Plant32,429
- Substation / Converter7,614
- Oil & Gas Field7,055
- Coal / Uranium Mine5,382
- Pipeline4,951
- Cement Plant3,513
- Data Centre3,283
- Iron & Steel Plant1,293
- LNG Terminal1,198
- Grid Storage965
- Iron Ore Mine949
- Chemical Plant868
- Interconnector704
- Export Terminal519
- Refinery279
- Storage / Tank Farm38
- Oil / Commodity Contract19
- Hydrogen Project18
- Carbon Capture (CCS)16
Chokepoints
Interconnector
China (GD) – China (MA) interconnection
71st-largest interconnector in China of 81 · top 28% worldwide (#193 of 704)
- Status
- operating
- Capacity
- 1,700 MW
- Length
- 107 km
- Connects to
- China
- Geometry
- Schematic — node to node, not a surveyed route
Comparable interconnectors · China · 81 ranked
- #1China (GD) – China (YU) interconnection29.7 GW
- #69China (SH) – China (ZH) interconnection2.5 GW
- #70China (GD) – China (HK) interconnection1.7 GW
- #71China (GD) – China (MA) interconnection1.7 GW
- #72China (QI) – China (TI) interconnection1.5 GW
- #73China (GD) – China (HA) interconnection1.2 GW
Co-located infrastructure · within 25 km
- 澳門檔案館 Arquivo de Macau223 m · Data Centre
- Yunnan Xundian Lianhe wind farm920 m · Power Plant · 100 MW · wind
- Guangdong-Macao Natural Gas Pipeline Network — Zhuhai Hengqin-Macau Gas Pipeline4.0 km · Pipeline
- Guangdong-Macao Natural Gas Pipeline Network — Dangzai-Macau Peninsula Gas Pipeline4.2 km · Pipeline
- Coloane B power station7.5 km · Power Plant · 450 MW · gas
- Coloane B power station7.5 km · Power Plant · 136 MW · gas
- Macau Cement Ka-Ho Cement Plant8.5 km · Cement Plant
- 珠海500千伏加林變電站12 km · Substation / Converter
- Zhuhai LNG17 km · LNG Terminal · 7 Mtpa
- 500 kV line19 km · Transmission Line
- Zhuhai Huangmaodao LNG Terminal22 km · LNG Terminal · 6 Mtpa
On the interactive map
A new power line between Guangdong and Macau has been completed in 2022, yet no additional info can be found on potentially other planned capacities going forward so this is set to 0.