Browse the atlas
OverWatts AtlasCountriesOwnersInsightsWireChangesSources Live map
Asset classes
- Transmission Line80,968
- Power Plant32,429
- Substation / Converter7,614
- Oil & Gas Field7,055
- Coal / Uranium Mine5,382
- Pipeline4,951
- Cement Plant3,513
- Data Centre3,283
- Iron & Steel Plant1,293
- LNG Terminal1,198
- Grid Storage965
- Iron Ore Mine949
- Chemical Plant868
- Interconnector704
- Export Terminal519
- Refinery279
- Storage / Tank Farm38
- Oil / Commodity Contract19
- Hydrogen Project18
- Carbon Capture (CCS)16
Chokepoints
LNG Terminal
Golden Pass LNG Terminal
16th-largest lng terminal in United States of 162 · top 6% worldwide (#65 of 1,166)
- Operator
- Golden Pass LNG Terminal
- Owner
- Exxon Mobil Corp, QatarEnergy
- Status
- idle
- Capacity
- 15.7 Mtpa
- Commissioned
- 2010
- Direction
- import
- Commodity
- lng
Comparable lng terminals · United States · 162 ranked
- #1Sabine Pass LNG Terminal30.4 Mtpa
- #14Rio Grande LNG (under construction)17.6 Mtpa
- #15Woodside Louisiana LNG Terminal16.5 Mtpa
- #16Golden Pass LNG Terminal15.7 Mtpa
- #17Monkey Island LNG Terminal15.6 Mtpa
- #18Safe Harbor Energy LNG Terminal15.33 Mtpa
Co-located infrastructure · within 25 km
- Golden Pass LNG Terminal0 m · LNG Terminal · 5.2 Mtpa
- Golden Pass LNG Terminal0 m · LNG Terminal · 5.2 Mtpa
- Golden Pass LNG Terminal0 m · LNG Terminal · 5.2 Mtpa
- Sabine Crossing Gas Pipeline3.4 km · Pipeline
- Sabine Pass LNG Terminal power station4.5 km · Power Plant · 1.2 GW · gas
- Sabine Pass LNG Terminal power station4.5 km · Power Plant · 416 MW · gas
- Chevron Phillips Port Arthur Chemical Plant11 km · Chemical Plant
- Port Arthur Refinery12 km · Refinery · 656 kb/d
- Motiva Enterprises Port Arthur Manufacturing Complex14 km · Chemical Plant
- Motiva Enterprises Port Arthur Refinery power station14 km · Power Plant · 552 MW · gas
- BASF Port Arthur Chemical Complex22 km · Chemical Plant
- Beaumont / Nederland22 km · Export Terminal
Methane observations · within 25 km
- 1,055 kg/hr · LNG terminal2022-06-10 · 4.7 km
- 981 kg/hr · LNG terminal2022-06-13 · 4.7 km
- 640 kg/hr · LNG terminal2022-06-09 · 4.7 km
- 634 kg/hr · LNG terminal2022-06-14 · 4.7 km
- 323 kg/hr · LNG terminal2022-06-13 · 4.7 km
Satellite detections from Global Energy Monitor’s Global Methane Emitters Tracker, each an instantaneous rate on the date shown — not an annual total, and not a current reading. GMET attributes a plume to a type of infrastructure, not to a named facility: these were observed near this asset, which is not evidence they came from it.
On the interactive map
Portfolio
SOURCE: Global Energy Monitor · Global Gas Infrastructure Tracker — LNG Terminals (GGIT) (CC BY 4.0)