Pipeline

Sabine Crossing Gas Pipeline

United States

Operator
Cheniere Energy
Status
proposed
Commissioned
2031
Length
7.96 km
Commodity
gas

Co-located infrastructure · within 25 km

Methane observations · within 25 km

Satellite detections from Global Energy Monitor’s Global Methane Emitters Tracker, each an instantaneous rate on the date shown — not an annual total, and not a current reading. GMET attributes a plume to a type of infrastructure, not to a named facility: these were observed near this asset, which is not evidence they came from it.

On the interactive map

Open the interactive map →

Portfolio

United States → United States

SOURCE: Global Energy Monitor · Global Gas & Oil/NGL Pipelines (GGIT / GOIT) (CC BY 4.0)