Asset classes
- Transmission Line80,968
- Power Plant32,429
- Substation / Converter7,614
- Oil & Gas Field7,055
- Coal / Uranium Mine5,382
- Pipeline4,951
- Cement Plant3,513
- Data Centre3,283
- Iron & Steel Plant1,293
- LNG Terminal1,198
- Grid Storage965
- Iron Ore Mine949
- Chemical Plant868
- Interconnector704
- Export Terminal519
- Refinery279
- Storage / Tank Farm38
- Oil / Commodity Contract19
- Hydrogen Project18
- Carbon Capture (CCS)16
Chokepoints
Taiwan — Energy Infrastructure
OverWatts maps 179 energy assets in Taiwan across 10 layers — the 46th-largest mapped base of 157 countries. They include 120 power plants, 18 LNG terminals and 11 iron & steel plants. Operating generation capacity is 47.4 GW, led by gas at 44%. Refining capacity is about 540 kb/d.
The companies named on the most assets are Taiwan Power Co (42), CPC Corporation Taiwan (17) and Ørsted A/S (8), counting both ownership and operatorship. Half of Taiwan's mapped assets in service predate 2002 (median commissioning year of the 84 with a known date), 25 came online in the past decade and the oldest still listed is Daguan I hydroelectric plant, dating from 1934. 40+ projects are under construction or proposed, led by Taichung power station (7.8 GW).
Operating generation capacity by fuel
Utility-scale sites of 100 MW and above. Distributed generation — rooftop solar especially — is outside the tracker, so this runs below national installed capacity.
- gas21.0 GW +27.1 GW planned
- coal15.5 GW +7.2 GW planned
- hydro3.9 GW +610 MW planned
- wind3.6 GW +22.2 GW planned
- solar2.3 GW +1.4 GW planned
- oil1.2 GW
- nuclear0 MW +5.1 GW planned
Electricity generated by fuel · 2025
What the fleet actually produced — distinct from the installed capacity above.
- gas141 TWh 49%
- coal105 TWh 36%
- solar16.1 TWh 6%
- wind12.0 TWh 4%
- hydro5.5 TWh 2%
- oil4.7 TWh 2%
- nuclear3.3 TWh 1%
- biomass2.1 TWh 1%
Ember · source · CC-BY-4.0
On the interactive map
Browse by asset class
Under construction & proposed
- Taichung power stationPower Plants · 7.8 GW · gas · 2026
- Round 3.3 Auction of Offshore wind projectPower Plants · 3.9 GW · wind
- Tunghsiao power stationPower Plants · 2.8 GW · gas · 2029
- Hsieh-Ho power stationPower Plants · 2.6 GW · gas · 2032
- Hsinta power stationPower Plants · 2.6 GW · gas · 2026
- Mailiao power stationPower Plants · 2.4 GW · gas · 2029
- Wo Neng Offshore wind farmPower Plants · 2.4 GW · wind
- Formosa 5 offshore wind farmPower Plants · 1.5 GW · wind
- Wei Lan Hai Miaoli Offshore wind farmPower Plants · 1.4 GW · wind
- Chia-Hui 3 power stationPower Plants · 1.3 GW · gas · 2029
- Chia-Hui power stationPower Plants · 1.3 GW · gas
- Kuo Kuang power stationPower Plants · 1.3 GW · gas · 2028
- Hai-Fu power stationPower Plants · 1.1 GW · gas · 2027
- Talin power stationPower Plants · 1.1 GW · gas · 2029
- Taichung Fengmiao Floating wind farmPower Plants · 1.1 GW · wind · 2027
- Zhu Ting Offshore wind farmPower Plants · 1.0 GW · wind
- Winds of September floating wind farmPower Plants · 820 MW · wind
- Formosa 6 Haiguang Offshore wind farmPower Plants · 800 MW · wind · 2029
- Xu Feng No. 2 Offshore wind farmPower Plants · 750 MW · wind
- Xu Feng No. 3 Offshore wind farmPower Plants · 750 MW · wind
- Formosa 3 offshore wind farmPower Plants · 720 MW · wind
- Datian Youde Offshore wind farmPower Plants · 700 MW · wind · 2029
- Huanpeng wind farmPower Plants · 700 MW · wind
- Chungchia power stationPower Plants · 611 MW · gas · 2026
- Dajia River Guangming hydroelectric plantPower Plants · 610 MW · hydro · 2038
- Dajia River Guangming hydroelectric plantGrid Storage · 610 MW · 2038
- Feng You Offshore wind farmPower Plants · 600 MW · wind
- Formosa 3 offshore wind farmPower Plants · 600 MW · wind · 2027
- Wo Neng Offshore wind farmPower Plants · 600 MW · wind
- Xu Feng No. 1 Offshore wind farmPower Plants · 600 MW · wind
- Greater Changhua Northwest wind farmPower Plants · 583 MW · wind · 2026
- Hai Long Offshore wind farmPower Plants · 512 MW · wind · 2026
- Taixi solar farmPower Plants · 500 MW · solar
- Formosa 4 offshore wind farmPower Plants · 495 MW · wind · 2028
- Huanyang Wei Lan Hai Changhua Offshore wind farmPower Plants · 440 MW · wind · 2028
- Greater Changhua Southwest wind farmPower Plants · 337 MW · wind · 2026
- Datan power stationPower Plants · 300 MW · gas · 2026
- Taipower Offshore wind farmPower Plants · 295 MW · wind
- Rui Li 1 Floating Offshore wind farmPower Plants · 180 MW · wind
- Winds of September floating wind farmPower Plants · 180 MW · wind
Largest assets
- Taichung power stationPower Plants · 7.8 GW · gas · 2026
- Datan power stationPower Plants · 6.6 GW · gas · 2006
- Taichung power stationPower Plants · 5.8 GW · coal · 1980
- Round 3.3 Auction of Offshore wind projectPower Plants · 3.9 GW · wind
- Hsinta power stationPower Plants · 3.5 GW · gas · 1998
- Mailiao RefineryRefineries · 540 kb/d · 1999
- Tunghsiao power stationPower Plants · 3.2 GW · gas · 2000
- Tunghsiao power stationPower Plants · 2.8 GW · gas · 2029
- Hsieh-Ho power stationPower Plants · 2.6 GW · gas · 2032
- Hsinta power stationPower Plants · 2.6 GW · gas · 2026
- Mailiao power stationPower Plants · 2.4 GW · gas · 2029
- Wo Neng Offshore wind farmPower Plants · 2.4 GW · wind
- Linkou power stationPower Plants · 2.4 GW · coal · 2016
- Mailiao power stationPower Plants · 2.4 GW · coal · 1999
- Talin power stationPower Plants · 2.1 GW · coal · 1996
- Hsinta power stationPower Plants · 2.1 GW · coal · 1982
- Fong Der power stationPower Plants · 2.1 GW · gas · 2004
- Kuosheng nuclear power plantPower Plants · 2.0 GW · nuclear · 1981
- Maanshan nuclear power plantPower Plants · 1.9 GW · nuclear · 1984
- Mailiao power stationPower Plants · 1.8 GW · coal · 2000
- Mingtan hydroelectric plantPower Plants · 1.6 GW · hydro · 1993
- Mingtan hydroelectric plantGrid Storage · 1.6 GW · 1993
- Formosa 5 offshore wind farmPower Plants · 1.5 GW · wind
- Wei Lan Hai Miaoli Offshore wind farmPower Plants · 1.4 GW · wind
- Ho-Ping power stationPower Plants · 1.3 GW · coal · 2002
Biggest owners & operators
- Taiwan Power Co42 23%
- CPC Corporation Taiwan17 9%
- Ørsted A/S8 4%
- China Steel Corp5 3%
- Copenhagen Infrastructure Partners P/S5 3%
- Formosa Petrochemical Corp5 3%
- Synera Renewable Energy Co Ltd5 3%
- Chinese Petroleum Corp4 2%
Counts an asset once per company named as its owner or operator; a joint venture counts for each partner.
Frequently asked
- How many energy assets does Taiwan have?
- OverWatts maps 179 in Taiwan across 10 asset classes — the 46th-largest mapped base of the 157 countries covered.
- How much electricity generation capacity does Taiwan have?
- About 47.4 GW operating across 58 plants, mostly gas 44%, coal 33% and hydro 8%.
- Who owns Taiwan's energy infrastructure?
- Taiwan Power Co is named as owner or operator on the most mapped assets (42), followed by CPC Corporation Taiwan (17), Ørsted A/S (8) and China Steel Corp (5).
- What energy projects are under construction in Taiwan?
- The largest under way or proposed are Taichung power station (7.8 GW), Round 3.3 Auction of Offshore wind project (3.9 GW) and Tunghsiao power station (2.8 GW).