Nicaragua · electricity network

Nicaragua power grid

OverWatts maps 776 km of Nicaragua's electricity transmission network across 50 line segments and 0 substations, the 119th most-mapped grid of 153 countries. Its backbone is high voltage (220–379 kV), carrying 776 km — 100% of the mapped length, with the highest tagged voltage at 230 kV. That works out to 6 km per 1,000 km² of land — partial OpenStreetMap coverage, ahead of 21% of mapped countries. It is connected to 2 neighbouring grids by 600 MW of existing cross-border transfer capacity, with a further 600 MW planned.

776 km
Mapped transmission line
0
Substations
#119
of 153 mapped grids
600 MW
cross-border · 2 neighbours
230 kV
Highest voltage

OpenStreetMap coverage

Partial6 km / 1,000 km²ahead of 21% of 153 mapped countries

This grades how completely OpenStreetMap has drawn Nicaragua's network — not how much network exists. Large, sparsely-populated countries score low for geographic reasons alone, and every kilometre here is mapped length, so the totals are a floor rather than an operator-reported figure. 0% of segments carry a real line name and 0% an operator tag.

Mapped line length by voltage

50 segments · a segment is credited to the country containing its midpoint, so a border-crossing line counts once, on one side.

Cross-border links from Nicaragua

600 MW existing · 600 MW planned · capacities from the Global Transmission Database v0.1 (CC BY 4.0), existing as of 2023

On the interactive map

Open the interactive map →

Load against the network

254 MW
Operating generation
km of line per substation
6
km per 1,000 km²

Where there is room to connect a new load depends on published hosting capacity, which most operators release only as their own map. OverWatts does not yet ingest those feeds, so these are the density measures the open data supports — generation and mapped demand against mapped network — not a headroom figure.

How Nicaragua compares · mapped grid by country

Frequently asked

How big is Nicaragua's transmission network?
OverWatts maps 776 km of transmission line in Nicaragua, across 50 segments, plus 0 substations. This is mapped length from OpenStreetMap, not an operator-reported total — where OSM is incomplete the figure is a floor, never a ceiling.
What voltage is Nicaragua's grid?
Most of the mapped network is high voltage (220–379 kV): 776 km of 776 km. The highest voltage tagged anywhere in the country is 230 kV.
How complete is the grid map for Nicaragua?
Partial — 6 km of mapped line per 1,000 km² of land, ahead of 21% of the 153 countries with any mapped grid. Coverage grades how completely OpenStreetMap has drawn the network, not how much network exists; large, sparsely-populated countries score low for geographic reasons alone.
What interconnectors connect Nicaragua to its neighbours?
600 MW of cross-border transfer capacity to Costa Rica, Honduras, plus 600 MW planned. Capacities are from the Global Transmission Database (v1.0, 2023).

Elsewhere in Nicaragua

Network geometry: OpenStreetMap (ODbL) © OpenStreetMap contributors, ingested and measured by OverWatts · derived 2026-07-26. Counts every mapped line of 220 kV and above; the map layer draws the ≥380 kV backbone only, so it shows less than is measured here.