Jordan · electricity network

Jordan power grid

OverWatts maps 782 km of Jordan's electricity transmission network across 73 line segments and 1 substations, the 118th most-mapped grid of 153 countries. Its backbone is extra-high voltage (380–764 kV), carrying 782 km — 100% of the mapped length, with the highest tagged voltage at 400 kV. That works out to 8.8 km per 1,000 km² of land — partial OpenStreetMap coverage, ahead of 31% of mapped countries. It is connected to 3 neighbouring grids by 620 MW of existing cross-border transfer capacity, with a further 1,550 MW planned.

782 km
Mapped transmission line
1
Substations
#118
of 153 mapped grids
620 MW
cross-border · 3 neighbours
400 kV
Highest voltage

OpenStreetMap coverage

Partial8.8 km / 1,000 km²ahead of 31% of 153 mapped countries

This grades how completely OpenStreetMap has drawn Jordan's network — not how much network exists. Large, sparsely-populated countries score low for geographic reasons alone, and every kilometre here is mapped length, so the totals are a floor rather than an operator-reported figure. 0% of segments carry a real line name and 0% an operator tag.

Mapped line length by voltage

73 segments · a segment is credited to the country containing its midpoint, so a border-crossing line counts once, on one side.

Cross-border links from Jordan

620 MW existing · 1.6 GW planned · capacities from the Global Transmission Database v0.1 (CC BY 4.0), existing as of 2023

On the interactive map

Open the interactive map →

Load against the network

5.1 GW
Operating generation
782
km of line per substation
8.8
km per 1,000 km²

Where there is room to connect a new load depends on published hosting capacity, which most operators release only as their own map. OverWatts does not yet ingest those feeds, so these are the density measures the open data supports — generation and mapped demand against mapped network — not a headroom figure.

How Jordan compares · mapped grid by country

Frequently asked

How big is Jordan's transmission network?
OverWatts maps 782 km of transmission line in Jordan, across 73 segments, plus 1 substations. This is mapped length from OpenStreetMap, not an operator-reported total — where OSM is incomplete the figure is a floor, never a ceiling.
What voltage is Jordan's grid?
Most of the mapped network is extra-high voltage (380–764 kV): 782 km of 782 km. The highest voltage tagged anywhere in the country is 400 kV.
How complete is the grid map for Jordan?
Partial — 8.8 km of mapped line per 1,000 km² of land, ahead of 31% of the 153 countries with any mapped grid. Coverage grades how completely OpenStreetMap has drawn the network, not how much network exists; large, sparsely-populated countries score low for geographic reasons alone.
What interconnectors connect Jordan to its neighbours?
620 MW of cross-border transfer capacity to Egypt, Syria, Israel & Palestina, plus 1,550 MW planned. Capacities are from the Global Transmission Database (v1.0, 2023).

Elsewhere in Jordan

Network geometry: OpenStreetMap (ODbL) © OpenStreetMap contributors, ingested and measured by OverWatts · derived 2026-07-26. Counts every mapped line of 220 kV and above; the map layer draws the ≥380 kV backbone only, so it shows less than is measured here.