Browse the atlas
Asset classes
- Transmission Line80,968
- Power Plant32,429
- Substation / Converter7,614
- Oil & Gas Field7,055
- Coal / Uranium Mine5,382
- Pipeline4,951
- Cement Plant3,513
- Data Centre3,283
- Iron & Steel Plant1,293
- LNG Terminal1,198
- Grid Storage965
- Iron Ore Mine949
- Chemical Plant868
- Interconnector704
- Export Terminal519
- Refinery279
- Storage / Tank Farm38
- Oil / Commodity Contract19
- Hydrogen Project18
- Carbon Capture (CCS)16
Chokepoints
Laos · electricity network
Laos power grid
OverWatts maps 3,200 km of Laos's electricity transmission network across 114 line segments and 4 substations, the 73rd most-mapped grid of 153 countries. Its backbone is high voltage (220–379 kV), carrying 2,519 km — 79% of the mapped length, with the highest tagged voltage at 500 kV. That works out to 13.9 km per 1,000 km² of land — moderate OpenStreetMap coverage, ahead of 46% of mapped countries. It is connected to 4 neighbouring grids by 8,625 MW of existing cross-border transfer capacity, with a further 3,668 MW planned.
OpenStreetMap coverage
This grades how completely OpenStreetMap has drawn Laos's network — not how much network exists. Large, sparsely-populated countries score low for geographic reasons alone, and every kilometre here is mapped length, so the totals are a floor rather than an operator-reported figure. 0% of segments carry a real line name and 8% an operator tag.
Mapped line length by voltage
- 380–764 kV681 km 21%
- 220–379 kV2,519 km 79%
114 segments · a segment is credited to the country containing its midpoint, so a border-crossing line counts once, on one side.
Cross-border links from Laos
- Thailand5.4 GW
- Cambodia2.6 GW
- Vietnam538 MW
- China60 MW
- Vietnam2.0 GW · planned
- Vietnam1.0 GW · planned
- Myanmar600 MW · planned
8.6 GW existing · 3.7 GW planned · capacities from the Global Transmission Database v0.1 (CC BY 4.0), existing as of 2023
On the interactive map
Load against the network
Where there is room to connect a new load depends on published hosting capacity, which most operators release only as their own map. OverWatts does not yet ingest those feeds, so these are the density measures the open data supports — generation and mapped demand against mapped network — not a headroom figure.
Operators tagged on Laos's network
- EdL5 56%
- EGAT2 22%
- Nam Ngum 2 Power Co Ltd2 22%
Segment counts from OSM `operator` tags, merged across spellings. Present on 8% of segments — this ranks who is recorded, not market share.
How Laos compares · mapped grid by country
- 1. People's Republic of China624,300 km
- 71. Ivory Coast3,260 km
- 72. Austria3,221 km
- 73. Laos3,200 km
- 74. Greece3,062 km
- 75. Ecuador3,012 km
Frequently asked
- How big is Laos's transmission network?
- OverWatts maps 3,200 km of transmission line in Laos, across 114 segments, plus 4 substations. This is mapped length from OpenStreetMap, not an operator-reported total — where OSM is incomplete the figure is a floor, never a ceiling.
- What voltage is Laos's grid?
- Most of the mapped network is high voltage (220–379 kV): 2,519 km of 3,200 km. The highest voltage tagged anywhere in the country is 500 kV.
- How complete is the grid map for Laos?
- Moderate — 13.9 km of mapped line per 1,000 km² of land, ahead of 46% of the 153 countries with any mapped grid. Coverage grades how completely OpenStreetMap has drawn the network, not how much network exists; large, sparsely-populated countries score low for geographic reasons alone.
- Who operates the grid in Laos?
- EdL, EGAT, Nam Ngum 2 Power Co Ltd are tagged as operators on mapped segments. Operator tags are present on 8% of Laos's segments, so this ranks who is *recorded*, not market share.
- What interconnectors connect Laos to its neighbours?
- 8,625 MW of cross-border transfer capacity to Thailand, Cambodia, Vietnam, China, plus 3,668 MW planned. Capacities are from the Global Transmission Database (v1.0, 2023).
Elsewhere in Laos
Network geometry: OpenStreetMap (ODbL) © OpenStreetMap contributors, ingested and measured by OverWatts · derived 2026-07-26. Counts every mapped line of 220 kV and above; the map layer draws the ≥380 kV backbone only, so it shows less than is measured here.