Browse the atlas
Asset classes
- Transmission Line80,968
- Power Plant32,429
- Substation / Converter7,614
- Oil & Gas Field7,055
- Coal / Uranium Mine5,382
- Pipeline4,951
- Cement Plant3,513
- Data Centre3,283
- Iron & Steel Plant1,293
- LNG Terminal1,198
- Grid Storage965
- Iron Ore Mine949
- Chemical Plant868
- Interconnector704
- Export Terminal519
- Refinery279
- Storage / Tank Farm38
- Oil / Commodity Contract19
- Hydrogen Project18
- Carbon Capture (CCS)16
Chokepoints
Bangladesh · electricity network
Bangladesh power grid
OverWatts maps 4,119 km of Bangladesh's electricity transmission network across 467 line segments and 13 substations, the 65th most-mapped grid of 153 countries. Its backbone is high voltage (220–379 kV), carrying 2,370 km — 58% of the mapped length, with the highest tagged voltage at 400 kV. That works out to 30.7 km per 1,000 km² of land — moderate OpenStreetMap coverage, ahead of 71% of mapped countries. It is connected to 1 neighbouring grid by 1,160 MW of existing cross-border transfer capacity.
OpenStreetMap coverage
This grades how completely OpenStreetMap has drawn Bangladesh's network — not how much network exists. Large, sparsely-populated countries score low for geographic reasons alone, and every kilometre here is mapped length, so the totals are a floor rather than an operator-reported figure. 11% of segments carry a real line name and 0% an operator tag.
Mapped line length by voltage
- 380–764 kV1,749 km 42%
- 220–379 kV2,370 km 58%
467 segments · a segment is credited to the country containing its midpoint, so a border-crossing line counts once, on one side.
Cross-border links from Bangladesh
1.2 GW existing · capacities from the Global Transmission Database v0.1 (CC BY 4.0), existing as of 2023
On the interactive map
Load against the network
Where there is room to connect a new load depends on published hosting capacity, which most operators release only as their own map. OverWatts does not yet ingest those feeds, so these are the density measures the open data supports — generation and mapped demand against mapped network — not a headroom figure.
How Bangladesh compares · mapped grid by country
- 1. People's Republic of China624,300 km
- 63. Azerbaijan4,192 km
- 64. Zimbabwe4,165 km
- 65. Bangladesh4,119 km
- 66. Bolivia3,788 km
- 67. Hungary3,786 km
Frequently asked
- How big is Bangladesh's transmission network?
- OverWatts maps 4,119 km of transmission line in Bangladesh, across 467 segments, plus 13 substations. This is mapped length from OpenStreetMap, not an operator-reported total — where OSM is incomplete the figure is a floor, never a ceiling.
- What voltage is Bangladesh's grid?
- Most of the mapped network is high voltage (220–379 kV): 2,370 km of 4,119 km. The highest voltage tagged anywhere in the country is 400 kV.
- How complete is the grid map for Bangladesh?
- Moderate — 30.7 km of mapped line per 1,000 km² of land, ahead of 71% of the 153 countries with any mapped grid. Coverage grades how completely OpenStreetMap has drawn the network, not how much network exists; large, sparsely-populated countries score low for geographic reasons alone.
- What interconnectors connect Bangladesh to its neighbours?
- 1,160 MW of cross-border transfer capacity to India. Capacities are from the Global Transmission Database (v1.0, 2023).
Elsewhere in Bangladesh
Network geometry: OpenStreetMap (ODbL) © OpenStreetMap contributors, ingested and measured by OverWatts · derived 2026-07-26. Counts every mapped line of 220 kV and above; the map layer draws the ≥380 kV backbone only, so it shows less than is measured here.