Browse the atlas
OverWatts AtlasCountriesOwnersInsightsWireChangesSources Live map
Asset classes
- Transmission Line80,968
- Power Plant32,429
- Substation / Converter7,614
- Oil & Gas Field7,055
- Coal / Uranium Mine5,382
- Pipeline4,951
- Cement Plant3,513
- Data Centre3,283
- Iron & Steel Plant1,293
- LNG Terminal1,198
- Grid Storage965
- Iron Ore Mine949
- Chemical Plant868
- Interconnector704
- Export Terminal519
- Refinery279
- Storage / Tank Farm38
- Oil / Commodity Contract19
- Hydrogen Project18
- Carbon Capture (CCS)16
Chokepoints
Refinery
Negishi Refinery
2nd-largest refinery in Japan of 10 · top 29% worldwide (#79 of 279)
- Operator
- ENEOS
- Status
- operating
- Capacity
- 270 kb/d
- Configuration
- Cracking
- Process units
- CDU / vacuum distillation · Fluid catalytic cracker (FCC) · Catalytic reformer · Hydrotreater
- Commodity
- crude
Product slate
Indicative- LPG & light ends
- 4%
- Gasoline / naphtha
- 36%
- Jet / kerosene
- 8%
- Diesel / gasoil
- 30%
- Fuel oil (residual)
- 14%
- Other / loss
- 8%
Typical slate for a cracking refinery — actual yields vary with crude and season.
Comparable refinerys · Japan · 10 ranked
- #1Mizushima Refinery380 kb/d
- #2Negishi Refinery270 kb/d
- #3Kashima Refinery270 kb/d
- #4Kawasaki Refinery258 kb/d
Co-located infrastructure · within 25 km
- Negishi LNG0 m · LNG Terminal · 14 Mtpa
- Isogo power station717 m · Power Plant · 1.2 GW · coal
- Isogo power station (original)717 m · Power Plant · 530 MW · coal
- Minami Yokohama thermal power station1.3 km · Power Plant · 1.1 GW · gas
- Negishi LNG Terminal2.0 km · LNG Terminal · 12 Mtpa
- Yokohama Trunk Line — 18.8 km · Pipeline
- JFE East Japan Works (Keihin) steel plant12 km · Iron & Steel Plant
- Shin Negishi Trunk Line13 km · Pipeline
- Ohgishima LNG Terminal13 km · LNG Terminal · 10.2 Mtpa
- Trans-Bay Gas Pipeline14 km · Pipeline
- DC Co Kawasaki Cement Plant14 km · Cement Plant
- Kawasaki Refinery15 km · Refinery · 258 kb/d
On the interactive map
Portfolio
SOURCE: Operator / EIA (approx.)