Browse the atlas
OverWatts AtlasCountriesOwnersInsightsWireChangesSources Live map
Asset classes
- Transmission Line80,968
- Power Plant32,429
- Substation / Converter7,614
- Oil & Gas Field7,055
- Coal / Uranium Mine5,382
- Pipeline4,951
- Cement Plant3,513
- Data Centre3,283
- Iron & Steel Plant1,293
- LNG Terminal1,198
- Grid Storage965
- Iron Ore Mine949
- Chemical Plant868
- Interconnector704
- Export Terminal519
- Refinery279
- Storage / Tank Farm38
- Oil / Commodity Contract19
- Hydrogen Project18
- Carbon Capture (CCS)16
Chokepoints
Interconnector
United States (US-SE-SEPA) – United States (US-CAR-SC) interconnection
109th-largest interconnector in United States of 159 · top 77% worldwide (#536 of 704)
- Status
- operating
- Capacity
- 361 MW
- Length
- 619 km
- Connects to
- United States
- Reverse capacity
- 252 MW
- Geometry
- Schematic — node to node, not a surveyed route
Comparable interconnectors · United States · 159 ranked
- #1United States (US-MIDW-MISO) – United States (US-MIDA-PJM) interconnection10.1 GW
- #107United States (US-FLA-SEC) – United States (US-FLA-TEC) interconnection368 MW
- #108United States (US-SW-AZPS) – United States (US-NW-WACM) interconnection367 MW
- #109United States (US-SE-SEPA) – United States (US-CAR-SC) interconnection361 MW
- #110United States (US-CAR-CPLW) – United States (US-CAR-DUK) interconnection356 MW
- #111United States (US-CENT-SWPP) – United States (US-NW-WACM) interconnection338 MW
Co-located infrastructure · within 25 km
- United States (US-CAR-CPLE) – United States (US-CAR-SC) interconnection0 m · Interconnector · 608 MW
- United States (US-CAR-DUK) – United States (US-CAR-SC) interconnection0 m · Interconnector · 733 MW
- DC BLOX Myrtle Beach Cable Landing Station6.7 km · Data Centre
- Grainger Generating Station20 km · Power Plant · 170 MW · coal
On the interactive map
Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's. — No planned interconnections oulined in the Ready-To-Go Transmission Projects 2023 report.
SOURCE: Global Transmission Database v0.1 (CC BY 4.0)