Interconnector

United States (US-CAR-CPLW) – United States (US-CAR-DUK) interconnection

United States

110th-largest interconnector in United States of 159 · top 77% worldwide (#537 of 704)

Status
operating
Capacity
356 MW
Length
161 km
Connects to
United States
Reverse capacity
219 MW
Geometry
Schematic — node to node, not a surveyed route

Comparable interconnectors · United States · 159 ranked

All interconnectors in United States

Co-located infrastructure · within 25 km

On the interactive map

Open the interactive map →

Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's. — Duke Energy Progress West (CPLW) to Duke Energy Carolinas (DUK). There is overlap between service being provided by Duke Energy Progress West (CPLW) and Duke Energy Carolinas (DUK) in some western North Carolina counties. Craggy Enka is a project that is upgrading existing transmission infrastructure that might connect both Balancing Authorities, but there is no information confirming that it is transferring electricity between these balanci

SOURCE: Global Transmission Database v0.1 (CC BY 4.0)