Interconnector

United States (US-NW-NEVP) – United States (US-NW-PACE) interconnection (planned)

United States

28th-largest interconnector in United States of 159 · top 32% worldwide (#220 of 704)

Status
proposed
Capacity
1,500 MW
Commissioned
2027
Length
344.4 km
Voltage
500 kV
Connects to
United States
Geometry
Schematic — node to node, not a surveyed route

Comparable interconnectors · United States · 159 ranked

All interconnectors in United States

Co-located infrastructure · within 25 km

On the interactive map

Open the interactive map →

Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's. Distance for planned capacity is converted from miles into km. — Planned capacity relates to the Cross-Tie Transmission Line. Construction is expected to start in Q1 of 2025 with assumed year of operation being 2027.