OverWatts AtlasCountriesOwnersInsightsWireChangesSources Live map
Asset classes
- Transmission Line80,968
- Power Plant32,429
- Substation / Converter7,614
- Oil & Gas Field7,055
- Coal / Uranium Mine5,382
- Pipeline4,951
- Cement Plant3,513
- Data Centre3,283
- Iron & Steel Plant1,293
- LNG Terminal1,198
- Grid Storage965
- Iron Ore Mine949
- Chemical Plant868
- Interconnector704
- Export Terminal519
- Refinery279
- Storage / Tank Farm38
- Oil / Commodity Contract19
- Hydrogen Project18
- Carbon Capture (CCS)16
Chokepoints
Interconnector
United States (US-SW-AZPS) – United States (US-CAL-CISO) interconnection
30th-largest interconnector in United States of 159 · top 32% worldwide (#223 of 704)
- Status
- operating
- Capacity
- 1,458 MW
- Length
- 918 km
- Connects to
- United States
- Reverse capacity
- 325 MW
- Geometry
- Schematic — node to node, not a surveyed route
Comparable interconnectors · United States · 159 ranked
- #1United States (US-MIDW-MISO) – United States (US-MIDA-PJM) interconnection10.1 GW
- #28United States (US-NW-NEVP) – United States (US-NW-PACE) interconnection (planned)1.5 GW
- #29United States (US-SE-SOCO) – United States (US-TEN-TVA) interconnection1.5 GW
- #30United States (US-SW-AZPS) – United States (US-CAL-CISO) interconnection1.5 GW
- #31United States (US-NW-BPAT) – United States (US-NW-GRID) interconnection1.4 GW
- #32United States (US-CAR-CPLE) – United States (US-CAR-DUK) interconnection1.4 GW
Co-located infrastructure · within 25 km
- Mexico – United States (US-CAL-CISO) interconnection0 m · Interconnector · 800 MW
- United States (US-CAL-BANC) – United States (US-CAL-CISO) interconnection0 m · Interconnector · 1.1 GW
- United States (US-NW-BPAT) – United States (US-CAL-CISO) interconnection0 m · Interconnector · 2.5 GW
- 200 kV HVDC line5.2 km · Transmission Line
- Digital Realty San Francisco SFO105.5 km · Data Centre
- 365 Main Street Data Center6.0 km · Data Centre
- 360 Spear Street Data Center6.1 km · Data Centre
- Port of Oakland Coal Terminal15 km · Export Terminal
- Dynegy Oakland Power Plant15 km · Power Plant · 149 MW · oil
- Richmond Port Coal Terminal19 km · Export Terminal
- Levin-Richmond Terminal20 km · Export Terminal
- Richmond Refinery20 km · Refinery · 245 kb/d
On the interactive map
Assumption that the max hourly interchange value reached between Jan 2019 - Dec 2023 is representative for available transmission capacity between BA's. — Planned capacity relates to the Ten West Link project which is expected to be operationalized in 2024. The line runs between Arizona Public Service Company (USAAZ) and the territory of CAISO (USACI).